Home

Los Angeles District

Run scraper

To discharge fill material into 4.86 acres of non-wetland waters of the United States for the construction of a planned development on approximately 831 acres of land. The RSG Specific Plan would be a master-planned community organized into 44 planning areas and would include a mixture of residential

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

To discharge fill material into 4.86 acres of non-wetland waters of the United States for the construction of a planned development on approximately 831 acres of land. The RSG Specific Plan would be a master-planned community organized into 44 planning areas and would include a mixture of residential, commercial, open space, and recreational uses.

To discharge fill material into 4.86 acres of non-wetland waters of the United States for the construction of a planned development on approximately 831 acres of land. The RSG Specific Plan would be a master-planned community organized into 44 planning areas and would include a mixture of residential, commercial, open space, and recreational uses.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas