The applicant proposes to discharge 20,450 cubic yards of fill material.

Full Public Notice Proposed Project Plans Proposed Compensatory Mitigation Plan

PROJECT DESCRIPTION: The applicant proposes to discharge 20,450 cubic yards of fill material, and 17.32 cubic yards of concrete, into approximately 0.0115 acres of wetlands, 7.129 acres of palustrine forested wetlands, and 0.09 acres of streams, for the purpose of highway improvement activities. The proposed activities will be along a 4.47-mile stretch of US 59, from Fostoria Road to State Loop 573, and will consist of widening US 59 from a four-lane divided highway to a six-lane divided highway, with two frontage roads, an expansion of the bridge over the East Fork San Jacinto River, including the addition of two bridges, and one bridge replacement, as well as limited bicycle and pedestrian accommodations, and a 14-acre detention basin.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas