Home

St. Paul District

Run scraper

Notice of New Guidance - Alternative Method for Determining Wetland Mitigation Credit Potential for Hydrologic Restorations on Cultivated Fields in Minnesota

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SPECIAL PUBLIC NOTICE: The U.S. Army Corps of Engineers St. Paul District Regulatory Branch (Corps) and Minnesota Board of Water and Soil Resources (BWSR) have jointly developed a standardized method for determining credit potential associated with proposed wetland hydrology restorations in cultivated fields that are subject to annual disturbances due to cultivation. This method can be applied to proposed permittee-responsible, bank, or in-lieu fee wetland restoration projects seeking approval under either the Minnesota Wetland Conservation Act (WCA) or the Federal Mitigation Rule (33 CFR Part 332).

PROJECT DESCRIPTION AND PURPOSE: The U.S. Army Corps of Engineers St. Paul District Regulatory Branch (Corps) and Minnesota Board of Water and Soil Resources (BWSR) have jointly developed a standardized method for determining credit potential associated with proposed wetland hydrology restorations in cultivated fields that are subject to annual disturbances due to cultivation. This method can be applied to proposed permittee-responsible, bank, or in-lieu fee wetland restoration projects seeking approval under either the Minnesota Wetland Conservation Act (WCA) or the Federal Mitigation Rule (33 CFR Part 332)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas