You can copy from here when filling out the rest of the page.
SEMSWA is proposing traditional channel stabilization techniques, including raising the channel invert with a boulder sill and controlling grade by installing two riffle drop structures and one grouted sloping boulder drop structure. The existing Big Dry Creek (BDC) trail underpass will be relocated to an at-grade crossing of East Easter Avenue to allow for the expansion of the existing culvert.