You can copy from here when filling out the rest of the page.
PIPELINE INSTALLATION in ST. JOHN THE BAPTIST PARISH
NAME OF APPLICANT: Mt. Airy Terminals, LLC c/o C-K Associates, Attention: Brian Newman, 8591 United Plaza Blvd., Suite 300, Baton Rouge, LA 70809
LOCATION OF WORK: 4006 LA Hwy. 44, in Mt. Airy, in St. John the Baptist Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 30.07511111, Longitude: -90.62944444
Hydrologic Unit Code: 08070100 (Lower Mississippi-Baton Rouge)
CHARACTER OF WORK: To install two 24-inch pipelines between the existing Mt. Airy Terminal and the existing Bengal pipeline. Approximately 766-feet of the proposed 1.8-mile alignment will be trenched, and the remainder of the pipeline installation will utilize hydraulic directional drilling (HDD) methods, as shown on the enclosed drawings. Existing access roads will also be utilized to avoid new wetland impacts. Project-related impacts would occur to approximately 4.21-acres of jurisdictional wetlands, and the applicant has proposed the purchase of credits from an approved mitigation bank within the same watershed to compensate unavoidable impacts.