This Public Notice is supplemental to the Public Notice issued on September 14

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This Public Notice is supplemental to the Public Notice issued on September 14, 2017 for the proposed PennEast Pipeline project. This Public Notice concerns the work associated with four additional single and complete crossings of waters and/or wetlands associated with the overall project of constructing the proposed PennEast Pipeline. The four additional single and complete crossings were identified after revisions to the project alignment and after properties that were unable to be surveyed due to property owner refusal were surveyed. The overall project is under the jurisdiction of the Federal Energy Regulatory Commission, which issued a Final Environmental Impact Study on April 10, 2017 for the overall project. The U.S. Army Corps of Engineers is a cooperating agency on that document. The overall project proposed by the applicant is to construct 120.2 miles of new 36-inch diameter natural gas pipeline. More details are available in the "Public Notice & Plan Details" attachment. Public comments are due by June 22, 2019.

This Public Notice is supplemental to the Public Notice issued on September 14, 2017 for the proposed PennEast Pipeline project.This Public Notice concerns the work associated with four additional single and complete crossings of waters and/or wetlands associated with the overall project of constructing the proposed PennEast Pipeline. The four additional single and complete crossings were identified after revisions to the project alignment and after properties that were unable to be surveyed due to property owner refusal were surveyed. The overall project is under the jurisdiction of the Federal Energy Regulatory Commission (FERC) which issued a Final Environmental Impact Study (FEIS) on April 10, 2017 for the overall project. The U.S. Army Corps of Engineers is a cooperating agency on that document.

The overall project proposed by the applicant is to construct 120.2 miles of new 36-inch diameter natural gas pipeline. More details are available in the "Public Notice & Plan Details" attachment. Public comments are due by June 22, 2019.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers