BULKHEAD WITH BACKFILL, BOATSLIPS, AND BOAT DOCKS IN LIVINGSTON PARISH

NAME OF APPLICANT: Carter Pines Properties, LLC, c/o Carey Perry with ELOS Environmental, LLC, 43177 E. Pleasant Ridge Road, Hammond, LA 70403.

LOCATION OF WORK: In Blood River and Simeon Branch, at Carter Plantation in Springfield, Louisiana, in Livingston Parish, within the Pontchartrain Basin in hydrologic unit (HUC 08070203), as shown on the attached drawings (Latitude 30.418701 N, Longitude -90.577535 W).

The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred.

CHARACTER OF WORK: A previous authorization for the project site was issued as MVN-1999-00603-EC on 18 May 2000, and modified or extended for time on 21 July 2006, 20 November 2009, and 5 March 2014. Additionally, two dock structures have been constructed in Simeon Branch without prior authorization and are being evaluated after the fact. The applicant has requested Department of the Army authorization for an extension of time to complete the previously authorized bulkhead and boatslip construction and for the modification of the project to include construction and maintenance of a total of eighteen (18) 150-square foot boat dock structures in Simeon Branch. Approximately 2,228 linear feet of bulkhead on Simeon Branch and approx. 5,235 linear feet on Blood River have yet to be completed and approx. 25,463 cubic yards of dredged material would be excavated and redistributed behind the bulkhead to complete construction of the boat slips on Blood River. The additional impacts due to the proposed dock structures would total approx. 0.065 acres of waters of the US.

The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. All wetland impacts have been mitigated under previous authorizations and proposed impacts will occur in open waters or in areas which were previously authorized. The applicant is proposing to utilize best management practices during and after the construction phase of the project.

The applicant may be required to fully or partially restore the site to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas