You can copy from here when filling out the rest of the page.
LETTER OF PERMISSION: The applicant, the City of Lake Mills, is applying for a department of the Army permit to permanently discharge fill material within 1.68 acres of wetland for the purpose of constructing a new industrial facility within an existing Tax Increment District (TID). The development includes construction of a 85,000 square foot cross-docked food manufacturing facility with surface parking and stormwater treatment.
PROJECT DESCRIPTION AND PURPOSE: The applicant, the City of Lake Mills, is applying for a department of the Army permit to permanently discharge fill material within 1.68 acres of wetland for the purpose of constructing a new industrial facility within an existing Tax Increment District (TID). The development includes construction of a 85,000 square foot cross-docked food manufacturing facility with surface parking and stormwater treatment.