Home

St. Paul District

Run scraper

LETTER OF PERMISSION: The applicant

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LETTER OF PERMISSION: The applicant, the City of Lake Mills, is applying for a department of the Army permit to permanently discharge fill material within 1.68 acres of wetland for the purpose of constructing a new industrial facility within an existing Tax Increment District (TID). The development includes construction of a 85,000 square foot cross-docked food manufacturing facility with surface parking and stormwater treatment.

PROJECT DESCRIPTION AND PURPOSE: The applicant, the City of Lake Mills, is applying for a department of the Army permit to permanently discharge fill material within 1.68 acres of wetland for the purpose of constructing a new industrial facility within an existing Tax Increment District (TID). The development includes construction of a 85,000 square foot cross-docked food manufacturing facility with surface parking and stormwater treatment.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas