Home

Nashville District

Run scraper

This detailed project report

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This detailed project report, which includes a draft environmental assessment, has been prepared by the United States Army Corps of Engineers Nashville District to identify the most effective alternative while minimizing environmental, economic, and social impacts for the proposed flood risk management project located on the Harpeth River and its tributaries in the City of Franklin, Tennessee.

This detailed project report, which includes a draft environmental assessment, has been prepared by the United States Army Corps of Engineers Nashville District to identify the most effective alternative while minimizing environmental, economic, and social impacts for the proposed flood risk management project located on the Harpeth River and its tributaries in the City of Franklin, Tennessee.The City of Franklin is the non-Federal sponsor.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas