Home

St. Paul District

Run scraper

Specialty Manufacturing Facility

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PUBLIC NOTICE: APPLICATION FOR PERMIT TO permanently discharge fill material into 1.45 acres of wetland associated with the expansion of the Specialty Manufacturing Facility, in White Bear Lake Township.

PROJECT DESCRIPTION AND PURPOSE: The purpose of the project is to expand the Specialty Manufacturing warehouse facility with associated site improvements including parking lots, loading docks, grading for future office space, an addition to the existing southern facility on site, stormwater ponds, and wetland mitigation.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas