Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

APPLICATION FOR PERMIT Morro Bay Oyster Company Farm

The applicant is seeking after-the-fact authorization for the existing shellfish growing facilities (Pacific oyster, Crassostrea gigas, which occupy approximately 5 acres of Morro Bay, and authorization of a proposed 129.5 acre expansion. The project will be split in two phases: Phase 1, expanding by 5 acres in the next year and Phase 2, expanding up to the remaining 124.5 acres within five years. The applicant plans on additionally growing the indigenous Pismo clam (Tivela stultorum) and Manila clam (Venerupic philippinarum) within this expansion

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas