Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Application for Permit Renewal Port of San Diego Regional General Permit (RGP) No. 72 renewal

Work to be covered under the renewed RGP No.72 would include: routine maintenance of docks, wharves, piers, and piles on tidelands both in San Diego Bay and in the Pacific Ocean at the Imperial Beach Pier; like-for-like repair or replacement of damaged and broken wooden, concrete, and/or plastic pier and fender piles, as needed; and like-for-like repair or replacement of pier, decks, deck boards, blocks, camel logs, installation of marine fenders, and other ancillary items, as needed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas