You can copy from here when filling out the rest of the page.
The City of San Diego is proposing to install two separate pipeline crossings of the San Diego River levee – (i) a 60 inch diameter plastic lined reinforced concrete pipe (PLRCP) influent sewer pipeline at Longitude 117 degrees 12.04' W, and (ii) a 30 inch diameter brine discharge pipeline at Longitude 117 degrees 11.96' W. Both pipes will be microtunneled under the levee. The 60 inch PLRCP installation is not anticipated to affect existing levee facilities, while installation of the 30 inch brine line may require removal of existing rip rap at the base of the levee. The purpose of the project is to divert more water for recycling, and to reduce ocean discharges.
The City of San Diego is proposing to install two separate pipeline crossings of the San Diego River levee – (i) a 60 inch diameter plastic lined reinforced concrete pipe (PLRCP) influent sewer pipeline at Longitude 117 degrees 12.04' W, and (ii) a 30 inch diameter brine discharge pipeline at Longitude 117 degrees 11.96' W. Both pipes will be microtunneled under the levee. The 60 inch PLRCP installation is not anticipated to affect existing levee facilities, while installation of the 30 inch brine line may require removal of existing rip rap at the base of the levee. The purpose of the project is to divert more water for recycling, and to reduce ocean discharges.