Home

Omaha District

Run scraper

City of Kearney - The City proposes to construct a whitewater kayak course in the North Channel of the Platte River. The project begins approximately 450 feet southwest of the 2nd Avenue Bridge and traverse east to approximately 150 feet west of the Central Avenue Bridge

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

City of Kearney - The City proposes to construct a whitewater kayak course in the North Channel of the Platte River. The project begins approximately 450 feet southwest of the 2nd Avenue Bridge and traverse east to approximately 150 feet west of the Central Avenue Bridge, the entire length of channel is 1,191 linear feet. The work associated with the kayak course will include clearing and grubbing, removal of riprap and installation of new riprap, excavation and installation of whitewater drop structures, installation of whitewater obstacles, grading of channel banks, and construction of stepped riprap banks consisting of boulders for pedestrian access (terracing). The entire length of the channel will have various boulder clusters cemented to the channel bottom to create pools and velocity breaks within the channel.

City of Kearney - The City proposes to construct a whitewater kayak course in the North Channel of the Platte River. The project begins approximately 450 feet southwest of the 2nd Avenue Bridge and traverse east to approximately 150 feet west of the Central Avenue Bridge, the entire length of channel is 1,191 linear feet. The work associated with the kayak course will include clearing and grubbing, removal of riprap and installation of new riprap, excavation and installation of whitewater drop structures, installation of whitewater obstacles, grading of channel banks, and construction of stepped riprap banks consisting of boulders for pedestrian access (terracing). The entire length of the channel will have various boulder clusters cemented to the channel bottom to create pools and velocity breaks within the channel.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas