Proposal to fill eight wetlands totaling 1.83 acres in order to accomplish site grading necessary to construct a bulk liquid transport trucking facility with appurtenant features such as parking, storage areas, and utilities. Located on 167th Street, west of Kedzie Avenue, Village of Hazel Crest, Cook County, Illinois.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. ArmyCorps of Engineers
Chicago District
Public Notice/Application Number: LRC-2019-00237
Comment Period BEGINS: July 11, 2019
Comment Period Expires: August 10, 2019
Applicant
Robert Heniff
Heniff Transportation
2015 Spring Road, Suite 780
Oak Brook, Illinois 60523
Proposed Action
Proposal to fill eight wetlands totaling 1.83 acres in order to accomplish site grading necessary to construct a bulk liquid transport trucking facility with appurtenant features such as parking, storage areas, and utilities (See attached drawings). A detailed description of this proposal is provided on page 2 of this notice.
Location of Proposed Action
Vacant parcel located on 167th Street, west of Kedzie Avenue, in Section 26, Township 36 North, Range 13 East, Village of Hazel Crest, Cook County, Illinois.
(Latitude 41.585336, Longitude -87.699117)
Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by August 10, 2019 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 404 of the Clean Water Act of 1972 (33 USC 1344)
Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2019-00237,Mr. Colin C. Smalley, PG
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at Colin.C.Smalley@usace.army.mil.
Project Description
The project as proposed would completely fill eight wetlands with general earthen fill from the project site. There is no planned off-site borrow area. The wetlands are proposed to be filled in their entirety by site grading as necessary to provide sufficient building, parking, and storage areas. The wetlands are depicted on the enclosed Sheet 1 of 2 (“Wetland Exhibit”). The wetlands are quantitatively described in the table below, all with low- to moderate- native vegetation diversity but none considered high quality aquatic resources. Historical imagery reveals most of these wetlands were created on site as a result of historic construction activities associated with the Interstate Highway System.
ID
Area (ac)
Wetland Type
C-Value
FQI
Wetland 1
0.31
Emergent
2.92
10.54
Review Area 1
0.09
Scrub-Shrub
1.67
4.08
Review Area 2
0.28
Forested
1.67
4.08
Review Area 7
Emergent
1.86
6.95
Review Area 3
0.15
Forested
2.25
4.5
Review Area 4
0.015
Forested
2.25
4.5
Review Area 5
0.11
Emergent
1.91
6.33
Review Area 6
0.87
Emergent
2.1
6.64
The applicant’s stated project purpose is to develop a specialty trucking facility with container storage, truck storage, and associated offices and maintenance facilities, located in proximity to the south Chicago industrial market with access to the Interstate Highway System.
Avoidance & Minimization
The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: “The wetlands are located throughout the eastern half of the property. No practical site plan would meet the purpose of the development while avoiding wetland areas.”
Mitigation
The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States:
“Impacts to the wetland will be mitigated for via wetland creation located on the development site. The project proposes to fill 1.83 acres. The wetlands generally consist of highly disturbed wetlands dominated by invasives. Due to the degraded nature of the wetlands, the applicant is proposing mitigation at a [ratio] of 1:1.
This unavoidable impact is due the fact these areas are located throughout the eastern portion of the site and no feasible site plan can avoid impacts. The applicant is proposing to create 1.86 acres of wetlands around the perimeter of the site. These created wetlands will consist of a higher quality of plants and soils than the existing wetlands. Created wetlands will be interspersed with a mix of emergent and open water components to provide a healthy, diverse wetland community. Sedge meadow and native prairie will also be planted within the mitigation areas.
The wetland mitigation areas will be subject to a 5-yr Monitoring and Maintenance Plan. Final plans will be developed during the permitting process.”
The Corps has not verified the adequacy of this mitigation proposal at this time and will make the final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332.
Regulatory Authority
This proposed action will be reviewed according to the provisions of Title 33, Code of Federal Regulations, Parts 320-332. These regulations implement the statutory authority found in Section 404 of the Clean Water Act of 1972 (Title 33, United States Code, Part 1251 et seq.).
Jurisdiction
This application will be reviewed according to the provisions of Section 404 of the Clean Water Act due to a proposed discharge of fill material in waters of the United States (wetlands connecting to an unnamed tributary to the Calumet Union Drainage Ditch).
Evaluation Factors
The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.
Preliminary Evaluation of Selected Factors
Water Quality:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water quality certification, or waiver thereof, for the proposed activity in accordance with Section 401 of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will not violate applicable water quality standards. The review by the IEPA is conducted in accordance with the Illinois water quality standards under 35 Illinois Administrative Code Subtitle C by providing an antidegradation assessment, which includes an evaluation of alternatives to any proposed increase in pollutant loading that may result from this activity.
The "Fact Sheet" containing the antidegradation assessment for this proposed project may be found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water, Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
Department of Natural Resources:
The applicant may have to submit an application to the Illinois Department of Natural Resources, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lakes and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Department of Natural Resources
Office of Water Resources
2050 West Stearns Road
Bartlett, Illinois 60103
If you have any questions please contact the IDNR at (847) 608-3116.
Endangered and Threatened Species:
The Corps of Engineers has determined that the proposed activity may affect a Federally-listed endangered/threatened species or designated critical habitat. Consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act of 1973, as amended (16USC1531etseq.) has been initiated (utilization of the Programmatic Biological Opinion for the Final 4(d) Rule for the Northern Long-Eared Bat; USFWS Consultation Code: 03E13000‑2019‑TA‑0332.)
Please note, an EcoCAT consultation for this project has been completed, with IDNR number 1901807.
Historic Properties/Cultural Resources:
The District has determined that, for purposes of Section 106 of the NHPA [see 36 CFR 800. 3(a) and 800.16(y)], the Federal “undertaking” which has the potential to cause effects on historic properties is limited to the verification of the above-cited Regional Permit pursuant to Section 404 of the Clean Water Act for project activities within the Permit Area. The “area of potential effects” (APE) for the undertaking is the same as the Permit Area and is shown on the enclosed Sheet 2 of 2, “Concept Plan” (see 33 CFR 325, Appendix C 1(g) and 36 CFR 800.4(a)(1)).
Based upon a review of historic aerial imagery and a comparison of the topographic contours on the 1953 and 1963 editions of the Harvey, Ill. U.S.G.S. 7.5-minute topographic quadrangle maps, we have determined that there are no historic properties present. The entire site has been cut and/or filled by 5 or more feet, so the District presumes that any historic properties which may have existed at one time have been destroyed during the grading associated with the Interstate Highway construction. Accordingly, the District has made a determination that there will be No Historic Properties Affected by the undertaking (see 36 CFR 800.4(d)(1)).
The District believes we have included all known consulting parties on this request. If you believe you are entitled to consulting party status, we invite you to concur with these determinations within 30 days of this request. If you need additional information, including copies of the materials the District relied upon to reach our determination, please contact us as soon as possible, to ensure you have all materials required by 33 CFR 800.11. If we do not hear from you within 30 days, we will proceed with the final public interest decision regarding issuance of the permit [33 CFR 325, Appendix C 7(b) and 36 CFR 800.3(c)(4)].
Environmental Impact Statement
A preliminary determination has been made that an environmental impact statement is not required for the proposed work.
Public Hearing
Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later than August 10, 2019. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Mr. Colin C. Smalley, PG of my staff by telephone at (312) 846-5538, or email at Colin.C.Smalley@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.