The applicant proposes to decommission Pipeline Segment Number (PSN) 8005 in place.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to decommission Pipeline Segment Number (PSN) 8005 in place. PSN 8005 is a 10" steel pipeline previously used to transport natural gas. This pipeline segment has been cut at the POB and POE, flushed, filled with native seawater, and capped. In locations in which pipeline exposures are found, the pipeline would be lowered to obtain adequate depth of cover. The end of pipe at EB-110 A will not be covered, as the tube turn will be left intact and the pipe will be protected by the jacket that will be reefed in place in accordance with applicable regulations and a separate approval process. The end of pipe and subsea tie-in (SSTI) will be covered with concrete mats. The applicant’s plans are enclosed in 5 sheets.

In accordance with the Bureau of Safety and Environmental Enforcement (BSEE) 30 CFR 250.1750 pipeline decommissioning requirements, the applicant proposes to: 1. Disconnect from previously serviced platform and SSTI connection; 2. Flush by pigging, and filling with seawater to equalize the line pressure; 3. Plug each end of the pipeline; and 4. Confirm depth of cover at the pipeline ends, and cover endpoints with protective concrete mats. The BSEE project number is Segment 9434.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas