PROPOSED INSTALLATION OF 20-INCH PIPELINE BETWEEN CLOVELLY STATION AND LOOP’S TANK FARM FACILITIES IN LAFOURCHE PARISH

NAME OF APPLICANT: Crimson Midstream, LLC, c/o T. Baker Smith, LLC., P.O. Box 2266, Houma, LA 70361

LOCATION OF WORK: In open waters between Clovelly Station and LOOP, LLC’s tank farm facility (Latitude: 29.475786, Longitude: -90.260751 and Latitude: 29.454028, Longitude: 90.265956) near Galliano, Louisiana, in Lafourche Parish, within the East Central Louisiana Coastal basin in hydrological unit (HUC 08090301), as shown on the attached drawings.

CHARACTER OF WORK: The applicant has requested Department of the Army permit authorization to install and maintain 1.85 miles of new 20-inch pipeline to support the transport of product between existing facilities. The project will require the excavation of approximately 30,842 cubic yards of material and the placement of approximately 7,646 cubic yards of fill. Approximately 5.1 acres of marsh and 6.4 acres of other waters will be impacted by the pipeline installation and construction of an access road. The applicant will utilize existing canals and roadways. All impacts are anticipated to be temporary. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. Compensatory mitigation requirements will be assessed after one complete growing season.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas