Home

Philadelphia District

Run scraper

The applicant is seeking Department of the Army authorization to construct a 22-story residential building (Tower) with mixed use space on the ground floor and a parking garage (Garage) within a portion of the existing footprint of Pier 34 and a public access park and walkway (Park) with in-water habitat enhancements within a portion of the original Pier 35 footprint and interpier area between Piers 34 and 35. The sites are located at 735 South Christopher Columbus Boulevard along the west bank of the Delaware River in Philadelphia

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant is seeking Department of the Army authorization to construct a 22-story residential building (Tower) with mixed use space on the ground floor and a parking garage (Garage) within a portion of the existing footprint of Pier 34 and a public access park and walkway (Park) with in-water habitat enhancements within a portion of the original Pier 35 footprint and interpier area between Piers 34 and 35. The sites are located at 735 South Christopher Columbus Boulevard along the west bank of the Delaware River in Philadelphia, PA. More details are available in the "Public Notice & Plan Details" attachment. Public comments are due by Sept 2, 2019.

The applicant is seeking Department of the Army authorization to construct a 22-story residential building (Tower) with mixed use space on the ground floor and a parking garage (Garage) within a portion of the existing footprint of Pier 34 and a public access park and walkway (Park) with in-water habitat enhancements within a portion of the original Pier 35 footprint and interpier area between Piers 34 and 35. The sites are located at 735 South Christopher Columbus Boulevard along the west bank of the Delaware River in Philadelphia, PA. More details are available in the "Public Notice & Plan Details" attachment. Public comments are due by Sept 2, 2019.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas