Home

Los Angeles District

Run scraper

SPL-2019-0812-NLH Murrieta Creek

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers is currently evaluating the sediment and vegetation removal and long-term operation and maintenance of Phases I and IIA of the Murrieta Creek Flood Control, Environmental Restoration and Recreation Project.

The U.S. Army Corps of Engineers (Corps), in coordination with the Riverside County Flood Control and Water Conservation District (RCFC&WCD), has completed a Draft Supplemental Environmental Assessment/ Environmental Impact Report (SEA/EIR) for the Murrieta Creek Flood Control, Environmental Restoration and Recreation Project associated with the Operation and Maintenance of Phase I and Phase IIa of the project.

This document is available for public review throughSeptember 3, 2019.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas