Florida Gas Transmission - ACMs over pipeline

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to lay 8-foot by 20-foot by 4.5-inch articulating revetment mattresses.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to lay 8-foot by 20-foot by 4.5-inch articulating revetment mattresses (ACMs), totaling 4.2 acres of fill, over a 24-inch-diameter pipeline crossing Galveston Bay that has shallow cover (less than 36 inches). A barge with crane, materials and material barges, work boats, and project essential personnel and divers will be mobilized to the project site for ACM placement. The crane will lower the mats to the bed of the bay where divers will work to position and place the ACMs atop the areas with shallow cover. The ACMs will overlap one another by 2 feet and be connected to each other with stainless steel worm drive connectors.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas