The applicant proposes to discharge 7,521 cubic yards of rip-rap.
Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to discharge 7,521 cubic yards of rip-rap into the 0.75 acres of the Neches River and 12,332 cubic yards of dredge material into Dredge Material Placement Area 25, to facilitate the reconstruction of the Riverfront Park shoreline along the Neches River. Anchored sheet pile bulkhead will be installed with rip-rap toe-walls in some areas. The total length of shoreline reconstruction is 2,197 linear feet. The purpose of the proposed project is to restore the line from damages that resulted from Hurricane Harvey.