Home

Galveston District

Run scraper

Marathon Petroleum - Texas City Ship Canal

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to discharge 13,000 cubic yards.

Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to discharge 13,000 cubic yards into 0.95 acres of West Bay to facilitate the construction of a 1,500-foot steel sheet pile bulkhead with backfill, 95 linear feet of sheet pile wall, 2 piles and a new emergency boat dock area. The area between the existing shoreline and the proposed bulkhead will be filled throughout with 0.95 acres of fill. The proposed project activity consists of the installation of the 1,500 feet of new steel sheet pile bulkhead, north and south of dock 32/34, with another 165 feet near the proposed emergency boat dock area. The applicant also proposes to remove an existing 1,260-square-foot wooden boat house and replace it with the proposed emergency boat dock area.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas