Home

Alaska District

Run scraper

POA-2001-00060-M3

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Mr. Stephen Weatherman, with the City and Borough of Sitka, states that the project purpose is to provide for continued disposal of bio-solids authorized under State of Alaska Permit SW3A047-21. The existing bio-solids receiving cell in Sitka is full. The proposed construction is required for continued operation of the Sitka Bio-Solid Landfill. Work being proposed includes expand the existing bio-solids landfill in Sitka, Alaska by expanding the landfill and constructing new containment berms. Specifically the work includes the placement of 14,700 cubic yards of classified type II rock and gravel fill material into 1.21 acres of wetlands to construct the containment berm. Overall the proposed project would result in the placement of fill material into 2.16 acres of wetlands. The project site is located within Section 15, T. 55 S., R. 63 E., Copper River Meridian; USGS Quad Map Sitka A-5; Latitude 57.101938º N., Longitude -135.389215º W.; in Sitka, Alaska. Please contact Matthew Brody at the address shown above, (907) 790-4493, or by email at: Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.

Mr. Stephen Weatherman, with the City and Borough of Sitka, states that the project purpose is to provide for continued disposal of bio-solids authorized under State of Alaska Permit SW3A047-21. The existing bio-solids receiving cell in Sitka is full. The proposed construction is required for continued operation of the Sitka Bio-Solid Landfill. Work being proposed includes expand the existing bio-solids landfill in Sitka, Alaska by expanding the landfill and constructing new containment berms. Specifically the work includes the placement of 14,700 cubic yards of classified type II rock and gravel fill material into 1.21 acres of wetlands to construct the containment berm. Overall the proposed project would result in the placement of fill material into 2.16 acres of wetlands. The project site is located within Section 15, T. 55 S., R. 63 E., Copper River Meridian; USGS Quad Map Sitka A-5; Latitude 57.101938º N., Longitude -135.389215º W.; in Sitka, Alaska. Please contact Matthew Brody at the address shown above, (907) 790-4493, or by email at: Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.

POA-2001-00060-M3, Granite Creek_PN

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas