This notice announces a prospectus has been submitted for the development of the Black Creek Stream and Wetland Mitigation Bank (BCSWMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

Public Notice No. 19-30 Nashville District Application No. LRN-2019-00034 Date: August 27, 2019;Expires: September 27, 2019

Please address comments to: Nashville District Corps of Engineers, Regulatory Division 3701 Bell Road, Nashville, TN 37214-2660

SUBJECT: This notice announces a prospectus has been submitted for the development of the Black Creek Stream and Wetland Mitigation Bank (BCSWMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

BANK SPONSOR: Wetland and Stream Restoration Services, LLC 713 Melpark Drive Nashville, TN 37204

LOCATION: The proposed Black Creek Stream and Wetland Mitigation Bank (BCSWMB) comprises approximately 266 acres in Greene County, Tennessee (Figure 1). The site is approximately 5 miles southwest of the town of Mohawk in Greene County. The site lies just eas of the intersection of TN-348 and TN-340 and can be accessed from Toby Rd, which bisects the site (36.1489, -83.1134). The site is within in the Nolichucky River Basin (8-digit HUC 0601010 and the Ridge and Valley Level III Ecoregion. The proposed mitigation project would restore approximately 0.8 miles (± 4253 linear feet) of ephemeral, intermittent and perennial stream channels in the Black Creek watershed, which is a tributary of Lick Creek that ultimately drains into the Tennessee River. In addition, the proposed project would restore 14.9 acres of wetlands.

PURPOSE: The BCSWMB proposes to provide compensatory stream mitigation for permitted impacts within the proposed geographic service area of the Nolichucky (06010108), Watauga (06010103), South Fork Holston (06010102), Lower French Broad (06010107), and Upper French Broad (06010105) HUC 8 watersheds. Mohawk, TN USGS Quadrangle.

GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquaticresources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.

A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the execution and management of the project. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate establishment of the mitigation site through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.

Approval of the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable state of Tennessee statute(s) and regulation(s).

PROJECT DESCRIPTION: The mitigation bank aims to improve overall ecological function and stability of Black Creek and the unnamed tributaries, as well as to provide ecological and water quality benefits within the Lick Creek Lower watershed (060101080806), a subset of the Nolichucky basin (06010108). The proposed mitigation bank would restore Black Creek and both Unnamed Tributaries (UT1 and UT2) using natural channel design techniques to provide a functional lift capable of restoring natural channel hydrologic, hydraulic, geomorphic, physicochemical, and biological characteristi These actions, coupled with reforestation of bottomland hardwood palustrine wetland communities, will enhance the wetland environment on site. The project goals and objectives are outlined below and will address existing impairments.

The site has been historically manipulated for agricultural use, impacting the natural vegetation and hydrology of the parcel. Ditching across the site and along the site boundaries have disconnected the site from typical drainage patterns and surface flow, and continuous disturbance of soils and planted crops have disrupted biological function. Restoration and enhancement of stream and wetland conditions will greatly improve the stability and functionality of the site. The main channel of Black Creek shows significant signs of ditching, straightening, and poor watershed management. This has caused the channel to become incised and disconnected from the floodplain. Because of this restriction the channel fails to achieve its natural hydraulic, biological or physicochemical function. Additionally, UT1 to Lick Creek, which begins at the outflow of a linear wetland on the east side of the site, has historically been relocated and straightened. Lick Creek is also incised, which has led to UT1 significantly head cutting down to Lick Creek. UT2, an intermittent channel in the north-western portion of the site, has been connected to a roadside ditch for drainage purposes and is currently oversized and unstable. The result is a site with significant points of instability and limited ecological function.

The project prospectus can be viewed at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. Information in the mitigation plan would serve as the basis for deriving and releasing credits for the mitigation bank.

HISTORIC AND CULTURAL RESOURCES: At this early stage in the regulatory process, n project designplans have been submitted; therefore, USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notic from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE will evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Secti 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance wit Section 106 of the National Historic Preservation Act, as appropriate.

ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in the vicinity of the proposed project:

Species Nomenclature

Federal Status

Mammals

Gray bat (Myotis grisescens)

Endangered

Fishes

Chucky Madtom (Noturus crypticus) Endangered

Snail Darter (Percina tanasi) Threatened

Freshwater Mussels

Spectaclecase (Cumberlandia monodonta)

Endangered

Oyster Mussel (Epioblasma capsaeformis)

Endangered

Snuffbox (Epioblasma triquetra)

Endangered

Pink Mucket (Lampsilis abrupta)

Endangered

Slabside Pearlymussel (Pleuronaia dolabelloides)

Endangered

Fluted Kidneyshell (Ptychobranchus subtentum)

Endangered

Rough Rabbitsfoot (Quadrula cylindrical strigillata)

Endangered

Rayed Bean (Villosa fabalis)

Endangered

Cumberland bean (Villosa trabalis)

Endangered

A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.

COMMENT PERIOD: Written statements received in this office by September 19, 2019 will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Ryan Evans at the above address or by email: ryan.evans@usace.army.mil.

\s\

Joshua W. Frost Chief, Regulatory Division (acting) U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas