This notice announces a prospectus has been submitted for the development of the Mule Train Mitigation Bank (MTMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.
Public Notice No. 19-32
Nashville District
Application No. LRN-2019-00746
Date: August 30, 2019; Expires: September 29, 2019
Please address comments to:
Nashville District Corps of Engineers,
Regulatory Division
3701 Bell Road,
Nashville, TN 37214-2660
SUBJECT: This notice announces a prospectus has been submitted for the development of the Mule Train Mitigation Bank (MTMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.
BANK SPONSOR: Mule Train Investments, LLC
Attention: Mr. Trey Evans
931 Monroe Drive NE
Atlanta, Georgia 30308
LOCATION: The proposed mitigation bank is located at central coordinates 36.467544°, -86.358160° to the north of Dry Fork Creek Rd, approximately 7 miles southwest of Bethpage and 13 miles northeast of the City of Gallatin in Sumner County, Tennessee. The proposed bank boundary is located within the Bethpage, Tennessee USGS Topographic Quadrangle and consists of approximately 60 acres within a combined property area of 429 acres. The proposed mitigation bank would incorporate approximately 20,003 linear feet of existing tributaries to Dry Fork Creek and approximately 9.12 acres of slope wetlands that are suitable for some aspect of restoration or enhancement.
PURPOSE: The MTMB is proposed to provide compensatory stream and wetland mitigation for permitted impacts within the primary service area of the Lower Cumberland-Old Hickory Lake Watershed (HUC 05130201). The Bank’s proposed secondary service area includes the Lower Cumberland-Sycamore Watershed (HUC 05130202) and Stones River Watershed (HUC 05130203).
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of mitigation banks are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and the use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the bank. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the
IRT is to facilitate the establishment of the mitigation bank through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
The approval for the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environmental Conservation (TDEC) pursuant to Section 401 of the CWA
and/or applicable state of Tennessee statute(s) and regulation(s). The USACE and TDEC provide no guarantee that any particular individual or general permit would be authorized in order to use the bank for compensation. The following is a summary of the prospectus for this project.
PROJECT DESCRIPTION: The project will consist of a natural channel design approach to restore and enhance streams and wetlands throughout the site, including riparian buffer enhancement along Dry Fork Creek, as well as the restoration and/or enhancement of seven (7) additional tributary streams. The enhancement of approximately 9.12 acres of wetland adjacent to Get Along Creek is also proposed. The mitigation work at the MTMB site will contribute to overall cumulative benefits of providing watershed-level restoration and protection necessary for accomplishing ecologically self-sustaining aquatic resources. This will be implemented through restoration and enhancement activities using a function-based methodology focused on achieving functional lift within the project site. The restoration of stream channels within the proposed MTMB project area will be applied using a Natural Channel Design (NCD) approach.
Dimensionless ratios will be developed from TDEC regional curves as well as geomorphologically stable reference reaches within the local watershed to size the dimension, pattern, and profile of the project streams. A reference ecosystem will also be evaluated to promote the most appropriate design considerations based on drainage area, flow regime, valley type, slope regime, Rosgen stream type, etc. Historical anthropogenic influences resulting from livestock and agricultural practices have precluded the site from reaching its full ecological potential. Assessing these functions prior to restoration, understanding what functions require improvement, and designing the mitigation site based upon a function-based approach, will in turn allow for the viability of accomplishing an ecologically self-sustaining mitigation site. Overall, current site conditions (i.e. constructed berms and excavated ponds) prevent the natural flow of surface and subsurface water moving throughout the site. In the current mitigation area, there is one (1) wetland (WET-A)
consisting of 9.12 acres. Natural hydrology of this slope wetland is obstructed because of an excavated farm pond and farm road that separates the wetland. Currently, approximately 0.78acres of wetland is proposed for rehabilitation and the remaining 8.34 acres would consist of enhancement efforts. Four (4) activities/practices will be implemented within the wetland areas to improve the function/value of the wetland areas, which include: (1) removal of berms to restore wetlands in historical wetland areas; (2) reshaping the landform, including the excavated pond and constructed farm road to a natural functioning contour and elevation; (3) enhancing surface and subsurface hydrology, and (4) planting native vegetation (trees & shrubs). Details are contained in the Mule Train Mitigation Bank Prospectus dated August 15, 2019. The plan can be viewed at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. Information in the prospectus would serve as the basis for establishing the stream and wetland mitigation banking instrument (MBI).
The MBI would describe in detail the physical and legal characteristics of the bank and how the bank would be established and operated.
HISTORIC AND CULTURAL RESOURCES: A resource review of available documentation archived at the Tennessee State Historic Preservation Office was also performed by Midsouth Cultural Resource Consultants. The results of this review indicated that no previously recorded archaeological sites are present within the property boundary; however, two previously recorded archaeological sites are present within a 1-mile radius. Additionally, a review of the National Park Service’s (NPS) National Register of Historic Places/Cultural Resources spatial dataset was conducted. The review found a total of 18 cultural resource structures, districts, and buildings located within a 10-mile radius of the proposed MTMB. Eight of these resources were located within a 5-mile radius and none were located within a 1-mile radius. A Phase I cultural/archaeological survey has not beenconducted for the site. At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot complete an effects determination for historic andcultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in Sumner County, Tennessee:
Species Nomenclature
Federal Status
Mammals
Gray bat (Myotis grisescens)
Endangered
Indiana Bat (Myotis sodalist)
Endangered
Northern Long-eared Bat (Myotis septentrionalis)
Threatened
Leafy Prairie-clover (Dalea foliosa)
Endangered
A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.
COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Mark G. McIntosh at the above address or by email: mark.g.mcintosh@usace.army.mil.
\s\
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers