BRIDGE REPLACEMENT IN ST. TAMMANY PARISH
NAME OF APPLICANT: St. Tammany Parish Government c/o ELOS Environmental, LLC., Attention: Brian Fortson, 43177 E. Pleasant Ridge Rd., Hammond, LA 70403
LOCATION OF WORK: On Third Avenue at Ponchitowala Creek, in Covington, in St. Tammany Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 30.429387, Longitude: -90.064476
Hydrologic Unit Code: 08090201 (Liberty Bayou- Tchefuncte River)
CHARACTER OF WORK: Placement of approximately 562 cubic yards of clay, 401 cubic yards of gravel, and 401 cubic yards of asphalt to facilitate the construction of a new concrete bridge on Third Avenue over Ponchitowala Creek. The existing Third Avenue bridge and appurtenant structures would be removed, and the existing road and ditch would be realigned and reconstructed. Approximately 0.60 acre of jurisdictional wetlands would be impacted due to the bridge/road replacement. The applicant proposes to compensate for unavoidable project-related impacts to 0.60 acre of jurisdictional wetlands though the purchase of wetland credits from a Corps’ approved mitigation bank within the appropriate watershed.