Home

Jacksonville District

Run scraper

The Jacksonville Permits Section

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Jacksonville Permits Section, Regulatory Division of the U.S. Army Corps of Engineers, Jacksonville District, will be hosting a consultant workshop to share information on how to better navigate the regulatory program and improve submittals of information allowing for more timely evaluations of applications. LOCATION: Jacksonville University, Davis Student Center, 2800 University Boulevard North, Jacksonville, Florida 32211. DATE AND TIME: November 5, 2019; 9:00 am – 4:00 pm

TO WHOM IT MAY CONCERN: The Jacksonville Permits Section, Regulatory Division of the U.S. Army Corps of Engineers, Jacksonville District, will be hosting a consultant workshop to share information on how to better navigate the regulatory program and improve submittals of information allowing for more timely evaluations of applications.

LOCATION: Jacksonville University, Davis Student Center, 2800 University Boulevard North, Jacksonville, Florida 32211.

DATE AND TIME: November 5, 2019; 9:00 am – 4:00 pm

Directions to the site are as follows: From Interstate-95 take Exit 353B and head east on West Union Street. Proceed until the intersection of Arlington Expressway and take that exit. Proceed until Exit 10A and take that exit. Turn left and proceed on University Boulevard North until you reach your destination located on the left side of the roadway.

APPROXIMATE CENTRAL COORDINATES: Latitude 30.350659° Longitude -81.606413°

PROPOSED WORKSHOP: The Corps will host a consultant workshop that will focus on Section 404 topics for the first half of the day and then Section 10 topics for the second half of the day. Lunch will be available for purchase at the dining facilities on the Jacksonville University Campus. Some of the topics at the workshop include developing a comprehensive application, avoidance/minimization, alternate site analysis, mitigation, and regulatory updates.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas