The District Engineer is reviewing a request from the City of Bismarck to modify a stormwater development permit issued on April 10, 2018. Upon receipt of final plans prior to commencement of construction, it was noted that there was a misinterpretation of a discussion about avoidance and incorporation of existing wildlife impoundments into the plan. The City proposes to replace the impoundments with engineered detention ponds, which increases permitted impacts from 4.23 acres to 12.52 acres. The City provided a revised mitigation plan for consideration. The project is located in northwest Bismarck, North Dakota in the NE¼ of Section 17, Township 139 North, Range 80 West, Burleigh County [Latitude 46.863237° North, Longitude -100.788299° West].
The District Engineer is reviewing a request from the City of Bismarck to modify a stormwater development permit issued on April 10, 2018. Upon receipt of final plans prior to commencement of construction, it was noted that there was a misinterpretation of a discussion about avoidance and incorporation of existing wildlife impoundments into the plan. The City proposes to replace the impoundments with engineered detention ponds, which increases permitted impacts from 4.23 acres to 12.52 acres. The City provided a revised mitigation plan for consideration. The project is located in northwest Bismarck, North Dakota in the NE¼ of Section 17, Township 139 North, Range 80 West, Burleigh County [Latitude 46.863237° North, Longitude -100.788299° West].