You can copy from here when filling out the rest of the page.
PROPOSED EXTENSION OF BARGE FLEET, MISSISSIPPI RIVER ASCENSION PARISH
NAME OF APPLICANT: CARLINE, 7262 LA-75, Geismar, Louisiana 70734
LOCATION OF WORK: In Mississippi River, right descending bank, at or near river mile or mile marker 168, near Donaldsonville, Louisiana, (30.106083, -90.917636), in Ascension and St. James Parishes, as shown on the enclosed drawings, within Hydrologic Unit Code 08070100, Lower Mississippi – Baton Rouge.
The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install and maintain monopole dolphins to sixteen existing barge fleet tiers (13 tiers permitted, 3 tiers unpermitted) within the Mississippi River. No dredging or fill will be required for the structure installation. No special aquatic sites will be affected by this project and no mitigation is anticipated.
The applicant may be required to fully or partially restore the site to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.