You can copy from here when filling out the rest of the page.
The applicant proposes to discharge 45,000 cubic yards of fill material.
Full Public Notice Project Plans Alternatives Analysis KCS Port Arthur PRM Summary HGM
PROJECT DESCRIPTION: The applicant proposes to discharge 45,000 cubic yards of fill material into 13.99 acres of palustrine forested (PFO) wetlands and 0.07 acres of palustrine emergent (PEM) wetlands during the construction of a loop track and tank terminal facility at the Port Arthur Terminal. The terminal facility will allow for the storage and transloading of various types of crude oil, bitumen, distillates, residual oils, renewable fuels, natural gas liquids, and/or related petroleum products.