Home

Galveston District

Run scraper

SWG-2017-00596 - Panther Interstate Pipeline Energy

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant is proposing a pipeline decommissioning.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant is proposing a pipeline decommissioning of a 16-inch oil pipeline originating at High Island Block 139 A Platform and terminating at a subsea tie-in, located in High Island Block 48, OCS Federal Waters, Gulf of Mexico, Offshore, Texas.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas