Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROPOSED HILCORP ENERGY COMPANY FLOWLINE REMOVAL IN LIRETTE OIL AND GAS FIELD in TERREBONNE PARISH

NAME OF APPLICANT: Hilcorp Energy Company c/o GeoEngineers, Inc., 11955 Lakeland Park Blvd. Suite 100, Baton Rouge, LA 70809

LOCATION OF WORK: In Lirette Oil and Gas Field and partially located in the Pointe-aux-Chenes Wildlife Management Area, in Terrebonne Parish, within the West Central Louisiana Coastal HUC 08090302, as shown on the attached drawings.

CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to remove plug and abandon 23 oil and gas wells and remove approximately 35,365 linear feet of flowline in open water and 19,220 linear feet of flowline in marsh. Approximately 4,584 cubic yards of material will be temporarily displaced in open waters and 8,542 cubic yards will be temporarily displaced in wetlands to remove the flowline. Approximately 17.6 acres of wetlands may be temporarily impacted by marsh buggy in the removal of the flowline. Propwashing for access to remove flowlines will displace 10,707 cubic yards in 9 acres of water bottoms. Approximately 533 cubic yards of rock material will be discharged for bankline stabilization.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas