State - Illinois;
Project purpose - To relocate wetlands and streams in order to facilitate the removal of subsurface coal materials.
This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act (CWA).
APPLICANT: Vigo Coal Operating Co., LLC
250 Cross Pointe Blvd.
Evansville, IN 47715
AGENT: Wetland Services, Inc.
3880 Trigg Turner Rd.
Corydon, KY 42406
LOCATION: Wetlands and unnamed tributaries to Fordice Creek in Wabash County, IL. HUC: Fordice Creek 051201130404
.
Latitude: 38.454904° North
Longitude: -87.859808° West
7.5 Minute Quad: Mt. Carmel Quadrangle
PURPOSE: To relocate wetlands and streams in order to facilitate the removal of subsurface coal materials.
DESCRIPTION OF WORK: The proposed project would result in the discharge of fill and/or dredged material into “waters of the United States” for a surface coal mining operation throughout a 437-acre site. The site is pending approval by Surface Mining Control and Reclamation Act (SMCRA) Permit No. 461.
The proposed project would fill 6,335 linear feet of ephemeral streams, 12,241 linear feet of intermittent streams, 1.2 acres of palustrine forested (PFO) wetlands, 0.2 acres of palustrine scrub/shrub (PSS) wetlands, 0.5 acres of palustrine emergent (PEM) wetlands, and 0.3 acres of palustrine unconsolidated-bottom wetlands (PUB). All economically recoverable coal would be removed during the excavation of the area, processed, and sold. The area would be returned to approximate original contours, covered with stockpiled soil material, revegetated, and returned to an approved post-mine land use through the SMCRA process.
AVOIDANCE, MINIMIZATION, AND MITIGATION MEASURES: The applicant’s preferred alternative, has taken into consideration various mining methods to maximize the opportunities for avoidance and minimization measures. On the 437 acre site; 330 acres would be impacted for an avoidance of 107 acres. Of the 23,179 total linear feet of streams present, 3,398 feet would be avoided, while 1,205 feet would have minimized impacts.
Mitigation is proposed to be undertaken both on and off-site, following the mining and reclamation phase, by a suite of approaches that would provide the appropriate compensation for the proposed impacts. These methods would include in-stream enhancements, Priority 2 stream restoration, PFO wetland restoration, PFO wetland enhancements, and forested riparian buffer restoration. The proposed mitigation would include efforts to expand previously authorized mitigation sites to provide spatially more expansive and contiguous blocks of protected mitigation areas.
The streams would employ a natural pattern, profile and dimension and would have forested riparian corridors adjacent to the reconstructed channels. Mitigated natural streams would be designed based on the Rosgen method, as adapted to the Illinois Basin. Rosgen B, or C channel type, dependent on stream and valley slope and would be planted with a minimum 50-foot forested riparian corridors on each bank for ephemeral streams and a minimum 100-foot forested riparian corridors on each bank for intermittent streams. Rapid Bioassessment Protocol (RBP) scores would be equal to or greater than 110 for the ephemeral natural channel stream mitigation, 115 for the intermittent natural channel stream mitigation by the end of the required monitoring phase. The mitigation plan proposes to include 2,515 feet of onsite intermittent stream, 10,938 feet of offsite intermittent stream, and 4,561 feet of onsite ephemeral stream; all with accompanying riparian buffer acreage. Impacts to all types of existing wetlands (2.2 acres) are proposed to be mitigated by a combination of providing 5 acres of PFO wetland restoration, 37.4 acres of PFO wetland enhancements, and 12.5 acres of PFO riparian buffer areas. The wetlands would be managed for hard mast species and constructed to receive hydrology from overbank flows of adjacent streams as well as precipitation.
It is noted that this proposed mitigation plan is open to comment and subject to change. The Corps will make a determination of appropriate mitigation, upon review of all submitted information.
REVIEW PROCEDURES:
A DA Permit cannot be issued if any legally required Federal, State, or local authorization or certification is denied. A DA permit, if otherwise warranted, will not be issued until a State of Illinois Water Quality Certification or waiver is on file at this office. In order to comply with Section 401 of the Clean Water Act, the applicant, by this notice, hereby applies for State certification from the Illinois Environmental Protection Agency (ILEPA).
Copies of this notice are sent to the appropriate Federal and State Fish and Wildlife Agencies. Their views and comments are solicited in accordance with the Fish and Wildlife Coordination Act of 1956. Based on available information, the proposed activity will not destroy or endanger any Federally-listed threatened or endangered species or their critical habitats, as identified under the Endangered Species Act, and therefore, initiation of formal consultation procedures with the U.S. Fish and Wildlife Service is not planned at this time.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. A request for a public hearing must state the specific interest which might be damaged by issuance of the DA Permit.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. A request for a public hearing must state the specific interest which might be damaged by issuance of the DA Permit.
The applicant has already contracted with an archeological firm to conduct a Phase I Archeological Survey, as well as a historic structure survey of the proposed project area. Pursuant to the requirements of the Programmatic Agreement between the Illinois State Historic Preservation Office (IL-SHPO) and the Illinois Department of Natural Resources, Office of Realty and Capital Planning (IDNR-ORCP); in a letter dated August 28, 2019, the Phase I report was submitted to IL-SHPO by IDNR-ORCP, with recommendations that none of the located archeological sites, nor associated extant structures were eligible for the National Register of Historic Places. The IL-SHPO concurred with IDNR-ORCP’s recommendation on September 16, 2019.
If we are made aware, as a result of comments received in response to this notice, or by other means, of specific archaeological, scientific, pre- historical, or historical sites or structures which might be affected by the proposed work, the District Engineer will immediately take the appropriate action necessary pursuant to the National Historic Preservation Act of 1966 - Public Law 89-665 as amended (including Public Law 96-515).
The decision whether to issue a permit will be based on an evaluation of the probable impact of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered; among those are conservation, economics, aesthetic values, general environmental concerns, historic values, fish and wildlife values, flood damage prevention, land use, navigation, recreation, water supply, water quality, energy needs, safety, food production, and in general, the needs and welfare of the public. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines (40 CFR Part 230) promulgated by the Administrator, United States Environmental Protection Agency (USEPA), under authority of Section 404(b) of the CWA.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. It is presumed that all interested parties and agencies will wish to respond; therefore, a lack of response will be interpreted as meaning that there is no objection to the proposed project. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Written statements received in this office on or before the closing date will become a part of the official record and will be considered in the determination on this permit request. Any objections which are received during this period will be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested DA Permit. A permit will be granted unless its issuance is found to be contrary to the public interest.
Information pertaining to this application is available for public examination during normal business hours upon prior request. Drawings are available on Louisville District's Internet site at http://www.lrl.usace.army.mil/Missions/Regulatory.aspx. All comments regarding this proposal should be addressed to Mr. Justin Garrett, CELRL-RDS at the address noted above and should refer to the Public Notice Number LRL-2019-405-JMG.
If you desire to submit your comments by email, you must comply with the following:
In the subject line of your email, type in ONLY the Public Notice ID No. LRL-2019-405-
JMG.
Example:
Subject: LRL-2019-405-JMG
b) Provide your physical mailing address and telephone number.
c) Send your email to: lrl.regulatorypubliccomment@usace.army.mil.
d) If you are sending attachments greater than 1 Mb in size with your email, you must send a
hard copy (CD or paper) to the Corps’ physical address as well.