SWG-2019-00804 - Kinder Morgan Tejas Pipeline

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to install approximately 4,500 sand/cement bags.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to install approximately 4,500 sand/cement bags (specifically, 3-N-1 grout bags) to support the pipeline prior to installation of 8-foot by 20-foot by 4.5-inch articulating concrete revetment mattresses (ACMs) over a 30-inch-diameter pipeline crossing Brazos River that has shallow cover. A barge with crane, materials and material barges, work boats, and project essential personnel and divers will be mobilized to the project site for ACM placement. The crane will lower the mats to the bed of the river where the divers will jet the perimeter edges (as needed) to position and place 35 ACMs atop the areas with shallow cover. The ACMs will overlap one another by 2 feet and be connected to each other with stainless steel worm drive connectors.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas