SUBJECT: Proposed Barge Terminal, Fleeting, Dredging, Bank Stabilization, Wetland Impacts, and Stream Relocation associated with Construction of a Multi-Modal Terminal at Cumberland River Mile 162.0, Right Descending Bank, Cheatham Lake, in Ashland City, Cheatham County, Tennessee

Public Notice No. 20-01 Nashville District Application No. LRN-2012-01077 Date: January 30, 2020;Expires: February 29, 2020

Please address all comments to: Nashville District U.S. Army Corps of Engineers (USACE) Regulatory Branch (Attn: Amy Robinson) 3701 Bell Road Nashville, TN 37214 Email: amy.m.robinson@usace.army.mil.

SUBJECT: Proposed Barge Terminal, Fleeting, Dredging, Bank Stabilization, Wetland Impacts, and Stream Relocation associated with Construction of a Multi-Modal Terminal at Cumberland River Mile 162.0, Right Descending Bank, Cheatham Lake, in Ashland City, Cheatham County, Tennessee

TO ALL CONCERNED: This project has been submitted for a Department of the Army (DA) permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (CWA) for the discharge of fill material into waters of the United States and for approval of a Consent to Easement on Government flowage easement.

APPLICANT: Logistic Services Inc. Alabama State Docks Blvd Building 55 P.O. Box 2188 Mobile, AL 36652

LOCATION: Proposed Barge Terminal, Fleeting Area, Dredging, Bank Stabilization, Wetland Fill, and Channel Relocation associated with Construction of a Multi-Modal Terminal at Cumberland River Mile 162.0, Right Descending Bank, Cheatham Lake, in Ashland City, Cheatham County, Tennessee (latitude 36.231936; longitude- 87.027341). USGS Quad Ashland City, TN. Cumberland River Navigation Chart #23.

DESCRIPTION: The applicant proposes a multi-modal terminal facility along approximately 1,670 linear-feet of river frontage and associated upland facilities at the subject location. The terminal facilities would provide storage and handling for the export and import of dry bulk commodities transferred to and from the site by barge, rail, and truck. The proposed barge terminal would involve construction of two crane pads and five mooring dolphins for barge fleeting for a total of 12 barges. Construction of the proposed upland facilities would involve wetland and stream impacts. These facilities would consist of storage and operation buildings, holding and staging areas, access roads, associated infrastructure, and construction of a rail spur and train staging lines. Overall, the new facility would involve the following proposed impacts:

1. Barge Terminal: Two crane pads would be constructed along the river bank as open cell systems consisting of vertically arranged and driven interlocking sheet piles. The “upriver” crane pad would extend riverward a maximum of 69 linear- feet from the ordinary high water mark (OHWM) Elevation 390’ for Cheatham Lake and 104 linear-feet with a breasted loaded barge and top pad elevation of 398’ (see Sheets 4 and 11). The “downriver” crane pad would extend riverward a maximum of 62 linear-feet from the OHWM and 97 linear-feet with a breasted loaded barge and top pad elevation of 400’ (see Sheets 6 and 13). The applicant anticipates loading/offloading 3 to 4 barges per week.

2. Fleeting Area: Five mooring dolphins would be installed in the Cumberland River for a fleeting area. Each dolphin would consist of a 5-foot diameter steel pipe driven to bedrock and filled with concrete. The dolphins would provide anchorage for a proposed barge fleeting area consisting of 3 wide by 4 long configuration, for a total of 12 barges, located along the river bank between the crane pads (see Sheets 7, 8, 9, and 12). The barge fleet would extend riverward 149 linear-feet which allows for approximately 467 linear-feet of navigable waterway.

3. Dredging: In order to accommodate the fleeted barges, the river bottom would be dredged in between the two proposed crane pads. The area to be dredged would range from 44 to 66 linear-feet wide by 1,153 linear-feet long to bottom elevation 370’ (approximately 15 linear-feet depth) for an estimated 6,403 cubic yards (see Sheets 7, 8, and 9). The dredged material would be placed onsite in a contained area, allowed to dry, then utilized on the property.

4. Wetland Impacts: To accommodate construction of the upland facilities, a discharge of fill material into a total of 4.30 acres of wetlands would occur at the following sites: 2.14 acres of WTL-1, 0.23 acres of WTL-2, 1.53 acres of WTL- 3, 0.39 acres of WTL-4, and 0.001 acres of WTL-5 (see Sheet 2). Approximately 0.75 acres of wetlands would remain undisturbed. To offset wetland impacts, the applicant proposes compensatory mitigation by purchasing 8.6 wetland mitigation credits (2:1 ratio) from the Tennessee Mitigation Fund, Lower Cumberland River Service Area.

5. Stream Relocation: Approximately 1,157 linear-feet of an unnamed, ephemeral channel would be relocated to accommodate construction of the upland facilities. A new channel, approximately 1,635 linear-feet long, would be constructed along the northern and western property boundary resulting in a net gain of 478 linear-feet of channel. The applicant states the proposed relocation coincides with the historical location of the channel before it was channelized and relocated by past development and agricultural uses. Additionally, natural stream channel characteristics would be incorporated into the new channel design along with a vegetated, natural buffer area (see Sheets 2, 14, and 15).

6. Stabilization: Placement of rock riprap is proposed to provide armor at each crane pad to prevent scour from tug boat activity and to protect the river bank along the fleeting area. The rock would extend approximately 15 linear-feet on the upstream and downstream sides of the crane pads, and 35 linear-feet in the front of each crane pad. Approximately 1,000 linear-feet of riprap would be placed along the fleeting area and would extend 3 linear-feet below the OHWM at a 2:1 slope.

7. Vegetation: The riparian vegetation along the river bank would be removed in areas required toaccess the barge terminal and fleeting areas. Approximately 632 linear-feet of riparian vegetation would be permanently removed and 275 linear-feet temporarily removed (see Sheets 7, 8, 9, and 10).

Plans of the proposed work are attached to this notice. If you wish to view additional plans, please contact this office or visit our web site at:http://www.lrn.usace.army.mil/Media/PublicNotices.aspx.

PURPOSE AND NEED: The purpose of the proposed project is to provide loading and off-loading facilities for dry and steel commodities by barge, rail, and truck transportation. One of the main criteria of the facility is river access for the barge terminal and fleeting area which are water dependent.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.:The original plans submitted for the proposed project have been modified to minimize potential impacts on navigation, government property, tree removal, threatened and endangered species, wetlands, and stream impacts. Originally, proposed wetland impacts was 4.63 acres but were reduced to 4.30 acres by reconfiguring the layout. Stream impacts originally involved total encapsulation of the unnamed tributary, 1,157 linear-feet, but the plans were modified to relocate the stream within a new 1,635 linear- feet channel, for a gain of 478 linear-feet. Additionally, a vegetated buffer area will be constructed along both stream banks. The configuration of the barge terminal and fleeting area were located as such to minimize navigation impacts. Additional onsite mitigation measures will be employed during and after construction.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA Permit.

HISTORIC AND CULTURAL RESOURCES: In a pre-application meeting, USACE Staff Archeologist recommended that a Phase I cultural resources survey should be conducted on portions of the property not previously investigated. Portions of the 40- acre parcel had been covered by a previous Phase I survey, resulting in negative results. Under separate cover, the Corps will provide copies of the Phase I cultural resource report to the SHPO and interested Tribes in association with Section 106 consultation.

A copy of this notice is being sent to Tennessee Historical Commission, the State Historic Preservation Office (SHPO), and Federally recognized tribes for their comments and consultation under Section 106 of the National Historic Preservation Act. The Corps invites responses from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area, and the public.

ENDANGERED/THREATENED SPECIES REVIEW: The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed under the ESA as threatened or endangered or any designated critical habitat. A review of USFWS’s Information for Planning and Conservation (IPaC) website (http://ecos.fws.gov/ipac/) identified the following federally-listed Threatened (T) and/or Endangered (E) species that may occur or could potentially be affected by the activities in this location:

Group

Common Name/Scientific Name

Status

Determination

Plants

Short’s Bladderpod/ Physaria globosa

E

May affect; not likely to adversely affect

Mammal

Indiana bat / Myotis sodalis

E

May affect; not likely to adversely affect

Mammal

Gray bat / Myotis grisescens

E

May affect; not likely to adversely affect

Mammal

Northern Long-Eared Bat (NLEB) /

Myotis septentrionalis

T

May affect; not likely to adversely affect

Clams

Cumberlandian Combshell /

Epioblasma brevidens

E

May affect; not likely to adversely affect

Clams

Orangefoot Pimpleback (Pearlymussel) / Plethobasus cooperianus

E

May affect; not likely to adversely affect

Clams

Pink Mucket (Pearlymussel) / Lampsillis abrupta

E

May affect; not likely to adversely affect

Clams

Ring Pink / Obovaria retusa

E

May affect; not likely to adversely affect

Due to potential criticalhabitat presence of aquatic mussel species, a reconnaissance survey is needed to assess potential mussel habitat including investigating the substrate and depth of the river bottom in the footprint of the proposed impact. Survey results would be reported to the Corps and shared with U.S. Fish and Wildlife Service (USFWS), Tennessee Wildlife Resources Agency (TWRA), and state of Tennessee Department of Environment and Conservation.

A habitat assessment was performed of the project site in January 2018 for federally listed bat species. Marginal habitat was found on the site but does occur within known swarming habitat for the NLEB. There are no known occurrence records for the Indiana bat. To determine presence or absence of listed bat species, a mist net survey of the site, consisting of 9 net-nights, was performed and results documented by a report dated June 6, 2019. Only one eastern red bat was captured within the project area and no federal listed T&E bat species.

No significant adverse effects to fish and wildlife, their habitats and human uses are expected to result from the proposed work. This public notice serves as coordination with the USFWS pursuant to Section 7 of the ESA of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to threatened and/or endangered species. After receipt of comments, USACE will evaluate potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.

OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work include, but not limited to:

a. Consent to Easement from USACE Real Estate Office. b. Water Quality Certification from the State of Tennessee, Department of Environment and Conservation (TDEC), is required for the proposed work in accordance with Section 401(a)(1) of the Clean Water Act.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for hearings shall state, with particularity, the reasons for holding a hearing.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and considered in the determination. Any response to this notice should be directed to the Regulatory Division, Attention: Amy Robinson, at the above address, telephone 615-369-7506, or email amy.m.robinson@usace.army.mil.

If you received this notice by mail and wish to view all of the diagrams, visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Ms. Robinson at the above address or email at: amy.m.robinson@usace.army.mil.

/s/ Timothy C. Wilder Chief, West Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas