You can copy from here when filling out the rest of the page.
The applicant proposes to construct, own, and operate the SPOT Deepwater Port which will include both existing and proposed onshore oil storage infrastructure and proposed onshore and offshore pipelines.
Full Public Notice Project PlansAlternatives Analysis Mitigation Plans HHD Contingency Plan
COMMENT PERIOD EXTENDED FOR 30-DAYS, FROM 4/28/2020 to 5/28/2020
PROJECT DESCRIPTION: The applicant proposes to construct, own, and operate the SPOT Deepwater Port (DWP) in order to be able to fully load Very Large Crude Carriers (VLCCs) without the need for ship-to-ship transfers and to enable the export of domestically produced ultralight, to light, to heavy grade crude oil to foreign global markets. In addition to the SPOT DWP offshore facility, the proposed project would include both existing and proposed onshore oil storage infrastructure and proposed onshore and offshore pipelines.