The applicant proposes to construct, own, and operate the SPOT Deepwater Port which will include both existing and proposed onshore oil storage infrastructure and proposed onshore and offshore pipelines.

Full Public Notice Project PlansAlternatives Analysis Mitigation Plans HHD Contingency Plan

COMMENT PERIOD EXTENDED FOR 30-DAYS, FROM 4/28/2020 to 5/28/2020

PROJECT DESCRIPTION: The applicant proposes to construct, own, and operate the SPOT Deepwater Port (DWP) in order to be able to fully load Very Large Crude Carriers (VLCCs) without the need for ship-to-ship transfers and to enable the export of domestically produced ultralight, to light, to heavy grade crude oil to foreign global markets. In addition to the SPOT DWP offshore facility, the proposed project would include both existing and proposed onshore oil storage infrastructure and proposed onshore and offshore pipelines.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas