You can copy from here when filling out the rest of the page.
Application for Permit Palm Desert Groundwater Replenishment Facility Project
The applicant’s proposed activity includes the extension of the Mid Valley Pipeline within the northern channel bank, placement of concrete slope protection, installation of flow through weirs and earthen berms for the purpose of constructing and operating of a replenishment facility to recharge the groundwater basin with Colorado River water.