Home

Galveston District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to permanently fill 5.46 acres.

Full Public Notice Project Plans Tier 2 401Questionnaire

PROJECT DESCRIPTION: The applicant proposes to permanently fill 5.46 acres of palustrine emergent wetlands (PEM) and 580 linear feet of stream in order to construct Phase II of a new high school and associated appurtenances. Phase II will consist of the construction of a north entrance road, practice fields, detention basin expansion, south access road, surface drainages, and parking lots.

Phase I of the proposed project was previously verified under Nationwide Permit 39 by the Corps’ on 23 September 2019. Phase I included the permanent fill of 0.02 acres (196 linear feet) of perennial stream in order to construct the school building, utility installation, detention basin outfall, and ceremonial entrance.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas