Home

Nashville District

Run scraper

The U. S. Army Corps of Engineers

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U. S. Army Corps of Engineers, Nashville District (Corps) has prepared a Draft Environmental Assessment (EA) and unsigned Finding of No Significant Impact (FONSI) to assess environmental effects associated with continued Operation and Maintenance (O&M) activities related to the Middlesboro Local Flood Protection Project (Middlesboro Project).

The U. S. Army Corps of Engineers, Nashville District (Corps) has prepared a Draft Environmental Assessment (EA) and unsigned Finding of No Significant Impact (FONSI) to assess environmental effects associated with continued Operation and Maintenance (O&M) activities related to the Middlesboro Local Flood Protection Project (Middlesboro Project). The Middlesboro Project was constructed in 1939 to protect the community of Middlesboro from flooding by diverting flow from Yellow Creek and tributaries around the city by a series of levees along a manmade diversion channel. The channel design facilitates deposition of stream bedload requiring periodic sediment removal and other O&M activities to maintain capacity to pass flood flows. O&M of the channel would address floodwater conveyance concerns.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas