This notice announces a prospectus has been submitted for the development of the Upper Cumberland Stream Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

Public Notice No. 20-04 Nashville District Application No. LRN-2019-00546 Date: March 16, 2020; Expires: April 15, 2020

Please address comments to: Nashville District Corps of Engineers, Regulatory Division, 3701 Bell Road, Nashville, TN 37214-2660

SUBJECT: This notice announces a prospectus has been submitted for the development of the Upper Cumberland Stream Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses ofAquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).

BANK SPONSOR: Hamilton Holdings, LTD 109 South 4thStreet Bardstown, KY 40004

LOCATION: The proposed Upper Cumberland Stream Mitigation Bank (UCSMB) comprises approximately 91 acres in Harlan Co., KY (Figure 1). The site is approximately 1.4 miles south of Pathfork, KY within in the Upper Cumberland River basin (8-digit HUC 05130101), and is located in the Central Appalachians Level III Ecoregion. The proposed mitigation project would restore approximately 4 miles (± 20,869 linear feet) of ephemeral, intermittent, and perennial stream channels in the Path Fork watershed, which is a tributary of Puckett Creek that ultimately drains into the Cumberland River.

PURPOSE: The UCSMB proposes to provide compensatory stream mitigation for permitted impacts within the Upper Cumberland River 8 Digit HUC unit (05130101), which is the primary service area. The secondary service areas include portions of the Rockcastle (05130102) Upper Cumberland-Lake Cumberland (05130103), and South Fork Cumberland River (05130104) 8 digit HUC units.

GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.

A group of federal and state regulatory and resource agency representatives known as theInteragency Review Team (IRT) would oversee the execution and management of the project. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate establishment of the mitigation site through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.

Approval of the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable State of Tennessee statute(s) and regulation(s).

PROJECT DESCRIPTION: The proposed mitigation activities at UCMB will improve habitat and water quality conditions in the Path Fork and Puckett Creek watersheds. The mitigation work at the site will contribute to the cumulative watershed-level restoration and protection of these natural resources. This watershed has historically experienced impacts from various anthropogenic sources such as coal mining, natural gas, and logging. Puckett Creek supports populations of Blackside dace (Chrosomus cumberlandensis), a federally threatened fish species. The other nearest known population of Blackside Dace is located approximately 2 miles south of the project site in the Brownies Creek watershed. Therefore, the proposed project would also support and contribute to the maintenance and recovery of the potential habitat for this unique species.

The project prospectus can be viewed by emailing Mr. Ryan Evans at:ryan.evans@usace.army.mil.Information in the mitigation plan would serve as the basis for deriving and releasing credits for the mitigation bank.

HISTORIC AND CULTURAL RESOURCES: At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE will evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.

ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally- listed species that are known to or believed to occur in the vicinity of the proposed project (Table 2):

Table 2. Potential Endangered and Threatened Species in the Proposed Project

Species Nomenclature

Federal Status

Mammals

Gray Bat (Myotis griescens)

Endangered

Indiana Bat (Myotis sodalis)

Endangered

Northern Long-eared Bat (Myotis septentrionalis)

Threatened

Fishes

Blackside Dace (Chrosomus cumberlandensis)

Threatened

A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.

COMMENT PERIOD: Written statements received in this office by April 15, 2020 (30 days) will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Ryan Evans at the above address or by email: ryan.evans@usace.army.mil.

\s\

Todd N. Tillinger Chief, Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.