Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SPECIAL PUBLIC NOTICE - Revised Mail Processing Instructions for the New Orleans District

SPECIAL PUBLIC NOTICE - Revised Mail Processing Instructions for the New Orleans District

Due to Coronavirus precautions, effective the date of this Public Notice, the New Orleans District Regulatory Branch is requesting all incoming correspondence be submitted electronically.

Please contact your assigned project manager (PM) directly via phone or email with any additional project information. All information will need to be provided via email. If you need to send oversized attachments, notify your PM that you have an oversized attachment to send. They will provide you with a Drop-off Request code for use on the SAFE website. Once you receive the Drop-off Request code, you will have 14 days to upload your documents.

All new permit application for projects located within the coastal zone, will need to be submitted using the Louisiana Department of Natural Resource (LDNR) electronic joint permit application process. More information about this process is located at the following website: http://www.dnr.louisiana.gov/index.cfm/page/93

All new permit application for projects located outside the coastal zone, will need to be submitted using the MVN electronic permit application process. More information about this process is located at the following website:

https://www.mvn.usace.army.mil/Missions/Regulatory/Permits/Electronic-Permits/

All new jurisdictional determination request will need to be submitted using the MVN electronic JD request process. More information about this process is located at the following website:

https://www.mvn.usace.army.mil/Missions/Regulatory/Jurisdiction-Wetlands/

If electronic submission is not possible, hard copy submissions through postal mail will continue to be accepted but will result in delayed processing times. Hard copy submissions should only be provided when electronic submissions are not possible. Precautionary internal mail handling procedures may be instituted to protect our workforce, which may result in longer than normal processing times.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas