Permit Modification for a Proposed Replacement of an Existing Truck Load- out Terminal to a Conveyor System at Cumberland River Mile 14.5, in Salem, Livingston County, Kentucky

Public Notice No. 20-24 Nashville District Application No. LRN-2000-01400 Date: March 23, 2020; Expires: April 7, 2020

Please address all comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Amy Robinson), 3701 Bell Road, Nashville, TN 37214

SUBJECT: Permit Modification for a Proposed Replacement of an Existing Truck Load- out Terminal to a Conveyor System at Cumberland River Mile 14.5, in Salem, Livingston County, Kentucky

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 10 of the Rivers and Harbor Act of 1899. In addition, a joint National Environmental Policy Act (NEPA) document will be prepared for the DA Permit modification.

APPLICANT:Pine Bluff Sand & Gravel Company 780 Spencer Road Salem, KY 42078

LOCATION: Permit Modification at Pine Bluff Sand & Gravel Company’s Existing Barge Facility located at Cumberland River Mile 14.5, right bank, in Salem, Livingston County, Kentucky (latitude 37.186389°, longitude -88.258333°)

DESCRIPTION OF ORIGINAL AND REVISED PROPOSAL: The proposed work consists of modifying the applicant’s existing barge facility from a truck load-out to a conveyor load-out system. The existing load-out terminal consists of a 50-foot by 195- foot jumbo barge secured to the shoreline by deadmen. The proposal involves replacing the existing barge with a 35-foot by 195-foot standard barge and anchored by spuds and the two existing deadmen. Two spuds would be centered at the aft and bow of the barge and would be 36-inch diameter in size and 75 feet long. The new conveyor and barge would be placed within the same footprint and maintain the existing riverward extension of approximately 100 linear feet. No dredging or additional fleeting is needed. The applicant states the proposed facility would not increase production or barge traffic and is proposed to improve safety andstability.

Background: The original DA permit was issued in 2001 to a previous owner, Cumberland River Resources, for construction of the existing fixed barge loadout terminal.

In 2011, a modification to the permit authorized construction of a second and third loadout consisting of a floating dock barge anchored with a ramp and stringout barges on either side and the general fleeting of 120 barges utilizing 34 deadman anchors. Abiological opinion issued with the modification, required placement of 4,100 linear feet of riprap along the river bank behind the fleeting areas which was installed in 2016.

In 2014, a modification authorized construction of eight mooring cells at CRM 14.4R.

On March 14, 2017, a DA permit modification changed barge fleeting at two locations from three rows (3 x 5) to five rows (5 x 5) resulting in fleeting of 20 additional barges. The proposal was advertised by Public Notice 16-31 on September 28, 2016.

Plans of the project modifications are provided in this notice.

If you received this notice by mail and wish to view all of the diagrams, visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx.

PURPOSE AND NEED: According to the applicant, the proposed modification would improve the loadout terminal’s stability and safety. Due to the varying water elevations especially during high water events at the project location, the spuds would allow the barge to easily rise and fall. The deadmen anchors would work as a secondary anchorage method. The applicant also stated no increase in production or barge traffic would result from the proposed work.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: The proposed modification is an improvement to an existing terminal and offers adequate water depths for work barge and moored barge. No additional disturbance of the site would be necessary for the modification of a truck loadout terminal to a spud barge with conveyor system. Any additional disturbance to the river bottom would be from the physical location of the two spuds. The proposed modification is to improve stability and in turn improve safety for commercial navigation.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a DA permit modification will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest.

SOLICITATION OF COMMENTS: The Corps is soliciting comments on the proposed revised plans from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, condition, or deny a permit modification for this proposal. Comments are used in the preparation of a supplemental Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act (NEPA).

HISTORIC AND CULTURAL RESOURCES: In 2001, the permittee conducted a Phase 1 survey of the loadout terminal area. USACE determined the action would not adversely impact cultural properties eligible for listing in the National Register of Historic Places (NRHP). Coordination with the State Historic Preservation Office (SHPO) was performed and by letter in February 2010, they concurred with the project. The proposed modification is to be placed within the same footprint of the existing terminal and would not involve any additional disturbances of upland areas. Additionally, no dredging would be performed and the only river bottom impact (14.1 square feet) would be from the placement of two spuds (approximately 14.1 square feet). Based on the small impact area, this office determines the proposed modification would not adversely impact cultural properties eligible for listing in the NRHP. The Corps invites responses from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area, and the public.

THREATENED and ENDANGERED (T&E) SPECIES REVIEW: In 2010, a mussel survey of the project site was performed and the result of the nearest transect to the barge, A-23 at mile 14.4, yielded zero mussels from 0-30 meters, 5 mussels from 30-40 meters (not endangered or threatened) and zero mussels from 40-50 meters. The proposed replacement will extend from 23 meters to 30 meters from the shoreline and no mussels were discovered in this area. Based on the past survey result and the very Additionally, the U.S. Fish and Wildlife Service (USFWS) issued a “Biological Opinion on the Pine Bluff Sand and Gravel Project, Cumberland River Mile 13.5 to 15.1, Right Bank, Livingston County, Kentucky, and its effects on the endangered fat pocketbook mussel (Potamilus capax)” (FWS #2010-B-0829). The biological opinion (BO) concluded that twelve fat pocketbook mussels and 7.2 acres of habitat could be taken as a result of the proposed action. For mitigation, the permittee agreed to special conditions, including making a contribution ($23,880) to the Kentucky Waterways Alliance, Kentucky Aquatic Resources Fund, and armoring 4,100 linear feet of shoreline behind the fleeting areas with riprap. USACE also determined the proposed project will have no adverse effect on the Prices Potato Bean plant, the Indiana Bat, northern long- eared bat, and Gray Bat. With this current modification request, USACE has determined the proposed expansion is located within an existing disturbed area and currently operating terminal and is located within the previously covered 7.2 acres of habitat impact area, and the impact area is very small (14.1 square feet), and that the findings provided in the original BO remain valid, the environmental baseline for the overall action has not changed, and the modified action would not result in additional adverse effects on federally listed mussels. USACE is re-initiating consultation with the USFWS necessary to fulfill our obligations under Section 7 of the Endangered Species Act. Per this notification, we request comments from the USFWS concerning potential impacts to T&E species for the proposed modification.

OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the revised project plans including:

1. While not required for DA permit issuance, the commonwealth of Kentucky, Division of Water, advised the applicant a water quality certification pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341) is required for the proposed modification.

2. In accordance with USACE’s obligation and procedures under Section 408 of the Rivers and Harbors Act, Engineer Circular (EC) 1165-2-216, dated July 31, 2014, Policy and Procedural Guidance for Processing Request to Alter U.S. Army Corps of Engineers Civil Works Projects pursuant to 33 USC 408, the USACE must determine if the proposed work will impair the usefulness of the federal commercial navigation project and/or be injurious to the public interest.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.

COMMENT PERIOD: Written statements received by April 7, 2020, will become a part of the record and considered in the determination. Any response to this notice should reference Corps Application No. LRN-2000-01400, and be directed to the Regulatory Division, Attn: Amy Robinson, at the above address or email: amy.m.robinson@usace.army.mil.

/s/

Timothy C. Wilder Chief, West Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas