The applicant proposes to construct two 150-foot breakwaters.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to construct two 150-foot breakwaters along the western entrance of the project site and two 50- to 75-foot breakwaters along the eastern entrance to the project site. Any gaps between the land/water interface will be filled with submerged riprap. The applicant also proposes to place 0.36 acres of fill material behind the proposed breakwaters in order to plant Spartina alterniflora on 3-foot centers.
The applicant proposes to mechanically and hydraulically dredge the marina area to -10 feet Mean Low Tide (MLT) (-10.29 feet Mean High Water) and remove approximately 50,000 cubic yards of material. The applicant proposes to place this material in Federal Dredged Material Disposal Facility-Placement Area 42 (PA42) and in upland areas. The applicant has stated that they may utilize turbidity curtains to control suspended sediments during dredging activities.
The applicant proposes to install a new, 120-slip, transient marina facility which will include a community building with a restroom, laundry, shower facilities, walkways and finger piers, fuel dock, on-site security, dockside utilities, and protected water basin for transient boaters. This project will establish a waypoint destination along the GIWW for the purpose of increasing transient boat traffic to the Bolivar Peninsula.
The applicant’s plans are enclosed in 29 sheets.