The applicant proposes to construct two 150-foot breakwaters.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to construct two 150-foot breakwaters along the western entrance of the project site and two 50- to 75-foot breakwaters along the eastern entrance to the project site. Any gaps between the land/water interface will be filled with submerged riprap. The applicant also proposes to place 0.36 acres of fill material behind the proposed breakwaters in order to plant Spartina alterniflora on 3-foot centers.

The applicant proposes to mechanically and hydraulically dredge the marina area to -10 feet Mean Low Tide (MLT) (-10.29 feet Mean High Water) and remove approximately 50,000 cubic yards of material. The applicant proposes to place this material in Federal Dredged Material Disposal Facility-Placement Area 42 (PA42) and in upland areas. The applicant has stated that they may utilize turbidity curtains to control suspended sediments during dredging activities.

The applicant proposes to install a new, 120-slip, transient marina facility which will include a community building with a restroom, laundry, shower facilities, walkways and finger piers, fuel dock, on-site security, dockside utilities, and protected water basin for transient boaters. This project will establish a waypoint destination along the GIWW for the purpose of increasing transient boat traffic to the Bolivar Peninsula.

The applicant’s plans are enclosed in 29 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas