DREDGE A SLIP ON BELLE PASS OF BAYOU LAFOURCHE IN LAFOURCHE PARISH
NAME OF APPLICANT: Greater Lafourche Port Commission, 16829 E Main Street, Cut Off, LA 70345.
LOCATION OF WORK: In Belle Pass, Sections 22, 24, 25, 26, and 28, T23S-R22E, just south of Port Fourchon, Louisiana, in Lafourche Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090301), as shown on the attached drawings (Latitude 29.103333 N, Longitude -90.206667 W).
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit fill and dredged material to construct and maintain a slip on Fourchon Island for the Fourchon Island Development Project (Phase 1) to include an 88.3 acre slip, an 8,223 LF bulkhead with fill, a 50 LF wide pipeline ROW, and the placement of dredged material in adjacent waters. Approximately 3,994,000 cubic yards of material would be dredged and deposited onsite and in adjacent open waters. A Preliminary analysis has determined that the proposed project would directly impact approx. 277.79 acres of jurisdictional marsh wetlands and approx. 514 acres of open waters.
It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant proposes to utilize dredged material from the excavation of the slip to convert approx. 514 acres of open water to marsh wetlands