This notice announces a Draft Mitigation Banking Instrument (DMBI) has been submitted for the development of the Goldsmith-Schiffman Wildlife Sanctuary Wetland Mitigation Bank (GSWMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008. This proposed project was previously advertised as PN 12-22, ending August 10, 2012. This Public Notice serves as an update to the proposed project.

Public NoticeNo 20-28 Nashville District File No. LRN-2011-00338 Date April 2, 2020

Please address all comments to: Nashville District, Army Corps of Engineers, Regulatory Division 1301 Riverfront Parkway, Chattanooga, Tennessee 37402 Attention: Aric Payne

SUBJECT: This notice announces a Draft Mitigation Banking Instrument (DMBI) has been submitted for the development of the Goldsmith-Schiffman Wildlife Sanctuary Wetland Mitigation Bank (GSWMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008. This proposed project was previously advertised as PN 12-22, ending August 10, 2012. This Public Notice serves as an update to the proposed project.

BANK SPONSOR: City of Huntsville, Alabama Landscape Management Division 308 Fountain Circle Huntsville, Alabama 35801 Attention: Ms. Joy McKee, Director

LOCATION: The proposed GSWMB would be within the Goldsmith-Schiffman Wildlife Sanctuary located in the City of Huntsville, Madison County, Alabama, Flint River Mile 15 Right Bank, Wheeler Lake Watershed (USGS HUC 06030002). USGS Quadrangle maps: Moontown and New Hope, Alabama. Latitude: N 34.63277º Longitude: W 86.47389º.

PURPOSE: The proposed GSWMB proposes to provide compensatory wetland and stream mitigation for permitted impacts by the City of Huntsville within the Huntsville City Limits.

GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by DA permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and the use of a mitigation bank. This bank is intended to be a single-client bank, providing compensatory mitigation for sole use by the City of Huntsville. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.

A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the bank. The IRT is chaired by the US Army Corps of Engineers, Nashville District (Corps). The primary role of the IRT is to facilitate the establishment of the mitigation bank through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the Corps.

Approval of the use of the bank for specific projects is the decision of the Corps pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Alabama Department of Environmental Management (ADEM) pursuant to Section 401 of the CWA and/or applicable state of Alabama statute(s) and regulation(s). The Corps and ADEM provide no guarantee that any particular individual or general permit would be authorized in order to use the bank for compensation.

PROJECT DESCRIPTION: The GSWMB DMBI objectives of the Bank site are to restore 69.49 acres of wetlands, enhance 14.93 acres of existing wetlands and preserve an additional 101.28 acres of existing wetlands. In addition, the DMBI proposes to preserve 6,893 linear feet of streams. The remaining acreage consists of non-credit generating buffers and trails. The proposed restoration and enhancement activities would re-connect floodplain wetlands with the Flint River, re-establish wetlands, and should improve water quality, hydrologic function, floodplain, habitat and riparian functions surrounded by an urbanized area. The work would be designed to improve a broad range of ecological functions including wetland habitat, water quality and hydrology. See Table 1 for the proposed mitigation approaches and credit calculation.

Habitat Type

Mitigation Type

Acreage/Linear Feet

Credit Ratio

Mitigation Credits

Uplands, Fields 1-4

Restoration

69.49 acres

1:1

69.49

Jurisdictional Wetlands,

Fields 1-4

Enhancement

14.93 acres

3:1

4.98

Forested Wetland

Preservation

101.28 acres

10:1

10.128

Perennial Streams

Preservation

6,893 linear feet

10:1

689.3

Forested Buffer

None

195.86 acres

N/A

N/A

HISTORIC AND CULTURAL RESOURCES: A Phase I archaeological survey was conducted in September 2009 on the entire 390 acre Goldsmith-Schiffman Wildlife Sanctuary. The survey resulted in the discovery of one new site, and review of one previously documented site. Under separate cover, the Corps will provide copies of the Phase I cultural resource report to the State Historic Preservation Office and interested Tribes in association with Section 106 consultation. A copy of this notice is being sent to the Alabama Historical Commission, the SHPO, and Federally recognized tribes for their comments and consultation under Section 106 of the National Historic Preservation Act. The Corps invites responses from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archaeological societies; parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area, and the public.

ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in the vicinity of the proposed project:

Species Nomenclature

Federal Status

Mammals

Gray bat (Myotis grisescens)

Endangered

Indiana bat (Myotis sodalis)

Endangered

Northern-long eared bat (Myotis septentrionalis)

Threatened

Fishes

Snail Darter (Percina tanasi)

Endangered

Clams

Pink mucket (Lampsilis abrupta)

Endangered

Rough pigtoe (Pleurobema plenum)

Endangered

Slabside Pearlymussel (Pleuronaia dolabelloides)

Endangered

Slender Campeloma (Campeloma decampi)

Endangered

Crustaceans

Alabama Cave Shrimp (Palaemonias alabamae)

Endangered

Plants

Morefield’s Leather Flower (Clematis morefieldii)

Endangered

Price’s Potato-bean (Apios priceana)

Threatened

A copy of this notice is being furnished to US Fish and Wildlife Service for their review. We are requesting comments from the USFWS concerning potential impacts to threatened and/or endangered species pursuant to Section 7(a)(2) of the Endangered Species Act, as amended. Initiation of formal consultation procedures with the USFWS is not planned at this time.

COMMENT PERIOD: Written statements received in this office on or before May 2, 2020 (30 days) will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Regulatory Division, Attention: Mr. Aric Payne, at the above address, or by email aric.j.payne@usace.army.mil.

\s\

Joshua W. Frost Chief, Technical Services Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas