Project Description: The Department of the Army permit application is to construct a dam within Willow Creek and an adjacent wetland to facilitate the creation of a pond

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Project Description: The Department of the Army permit application is to construct a dam within Willow Creek and an adjacent wetland to facilitate the creation of a pond, which will be used for oil and gas operations. The water retained in the pond would be used by oil and gas development. The applicant has excavated several upland areas, which are part of the proposed inundation area.

Location: The proposed project is in Section 8, Township 17 North, Range 10 West, near Willow Creek, Blaine County, Oklahoma. The project site can be found on the Hitchcock, Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude: 35.963090 and West Longitude 98.283410.

Purpose: The overall purpose of this work is to construct a dam to retain water. The project is not a water dependent activity.

Description of Work: The applicant proposes to construct a dam (420 linear feet) within 145 linear feet of Willow Creek and 0.07 acres of adjacent wetland, including embankment and spillway, utilizing soil earthen fill. The proposed construction will require the placement of 755 cubic yards of native soil material and rip rap below the Ordinary High Water Mark and within wetland boundaries. The work would be completed utilizing standard equipment for construction activities, such as excavators, bulldozers, frontend loaders, etc.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas