The U.S. Army Corps of Engineers, Nashville District (Corps) proposes to issue Regional General Permit (RGP) 20-02 for installation of structures and discharges of fill material into waters of the United States associated with management of exotic invasive aquatic species within the Nashville District regulatory boundaries. The Corps District Engineer proposes to issue the RGP for a period of five years.

Special Public Notice Nashville District Special Public Notice No. 20-23 Permit No. 20 RGP-02 Date: April 7, 2020; Expires: May 7, 2020

Please address comments to: U.S. Army Corps of Engineers, Nashville District Regulatory Division, 3701 Bell Road, Nashville, TN 37214-2660

SUBJECT: The U.S. Army Corps of Engineers, Nashville District (Corps) proposes to issue Regional General Permit (RGP) 20-02 for installation of structures and discharges of fill material into waters of the United States associated with management of exotic invasive aquatic species within the Nashville District regulatory boundaries. The Corps District Engineer proposes to issue the RGP for a period of five years.

PURPOSE: The purpose of the RGP issuance is to provide Department of the Army authorization for activities associated with exotic invasive aquatic species management that cause no more than minimal individual and cumulative adverse environmental effects.

PROPOSED ACTIVITES: All proposals for consideration under the RGP will be reviewed by the Corps in accordance with the permit conditions and application procedures listed below. RGP 20-02 would authorize structures or fills designed to permanently or temporarily isolate or limit the spread of populations of exotic invasive aquatic species for resource management purposes. Proposals for permanent structures must include an evaluation of maintenance needs associated with the control structure, including bedload and debris accumulation.

AUTHORITIES: The Regional General Permit, if issued, would provide authorization for activities associated with the management of exotic invasive aquatic species that would require Department of the Army authorization under Section 404 of the Clean Water Act (33 U.S.C. 1344) and/or Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).

SECTION 401 WATER QUALITY CERTIFICATION: Certification for the RGP is being requested from the following agencies:

- State of Alabama, Department of Environmental Management - Commonwealth of Kentucky, Natural Resources and Environmental Protection Cabinet - Commonwealth of Virginia, Department of Environmental Quality - State of Mississippi, Department of Environmental Quality - State of Tennessee, Department of Environment and Conservation

This public notice serves as notification to these agencies for their certification.

OTHER APPROVALS: The Tennessee Valley Authority (TVA) administers its Section 26a authority underPart 1304 of Title 18 of the Code of Federal Regulations (C.F.R.). Section 26a of the Tennessee Valley Authority (TVA) Act (16 U.S.C. §§ 831, et seq., as amended) requires that TVA approval be obtained prior to construction, operation or maintenance of any dam, appurtenant works, or other obstruction affecting navigation, flood control, public lands, or reservations across, along or in the Tennessee River or any of its tributaries.

HISTORIC AND CULTURAL RESOURCES: The Corps will comply with the National Historic Preservation Act of 1966, as amended, and procedures set forth in Appendix C of 33 CFR part 325. The Corps will conduct a case by case review as projects are proposed. The Corps will evaluate input by the State Historic Preservation Office, Tribal Historic Preservation Officers, Indian Tribes and the public in response to this public notice. An activity which may affect historic properties listed, or eligible for listing, in the National Register of Historic Places will not be authorized by this regional general permit until the Corps has complied with the provisions of Appendix C.

ENDANGERED/THREATENED SPECIES REVIEW: In compliance with the Endangered Species Act (ESA), the Corps will evaluate every proposed project and make an individual effect determination. In order to complete our evaluation of this proposal, comments are solicited from the U.S. Fish and Wildlife Service (FWS) and other interested agencies and individuals. If an individual activity proposed for authorization by this RGP may affect a species designated as threatened or endangered or adversely affect critical habitat, the Corps will consult with FWS before completing the permit determination.

EVALUATION FACTORS: The decision to issue the RGP will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposal on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety; food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of this proposal on the public interest will include application of the guidelines promulgated by the administrator of the Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R.; Part 230).

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposal. Any comments received will be considered by the Corps to determine whether to reissue the RGP. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposal.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.

COMMENT PERIOD: Written statements received in this office by May 7, 2020 (30 days) will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Ryan Evans at the above address or by email: ryan.evans@usace.army.mil.

PERMIT CONDITIONS:

1. The time limit for completing the work authorized ends two (2) years from the date authorization of each project. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least 45 days prior to the expiration date.

2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 20 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately notify the district engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The district engineer will initiate the federal, tribal and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.

4. The activities authorized by the RGP will not jeopardize a threatened or endangered species as identified under the Endangered Species Act, or destroy or adversely modify the critical habitat of such species. If the Permittee or the Permittee’s contractors discover any federally listed threatened or endangered species and/or their habitat while accomplishing work or activities authorized by the RGP, the Corps shall be immediately notified. If applicable, the permittee is also responsible for compliance with applicable terms and conditions of TVA issued 26.a Permit regarding federally listed endangered species.

5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification will be attached if approved.

6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

7. All construction debris will be disposed of on land in such a manner that it cannot enter a waterway, wetland, or other aquatic area.

8. Equipment for handling and conveying materials during construction must be operated to prevent unplanned and unapproved dumping or spilling of material into the waterway. All equipment must be cleaned of any oil, grease and debris prior to entering waterway.

9. Prevent materials spilled or stored on shore from washing into the water as a result of cleanupactivities, natural runoff, or flooding.

10. Perform all work in the waterway in a manner that minimizes suspended solids and turbidity.

11. Utilize only clean material free from excessive fines in order to avoid excessive localturbidity, unless the approved fill material is fine-grained.

12. All erosion control blanket or fabric used in or adjacent to waters of the U.S. must be biodegradable to ensure decomposition. Do not use material that includes a stabilized netting oropen mesh, as those products take a long time to degrade and trap small animals, birds, amphibians and fish. This prohibition also applies to mesh materials used for wattles, rolled materials, and bank wraps. Erosion control blanket or fabrics must break down within 24 months Use of non-degradable fabric can be allowed on a case-by-case basis if it is buried and is unlikely to be exposed.

13. Limit clearing of riparian or wetland vegetation to the absolute minimum necessary. Where temporary riparian or wetland vegetation impacts are unavoidable, it must be mowed or cut off above the ground and the topsoil and root mass must be left intact. The ground must then be restored to its original contours. Utilize seeding and planting as necessary to re-establishdesirable vegetative cover, utilizing native species in areas where native species were impacted.

14. Mitigation will be required for unavoidable adverse impacts to jurisdictional wetlands and streams. The permittee will be required to mitigate wetland and streams loss in accordance with the most recent Corps guidance and policy.

15. Place all dredged or excavated materials, with the exception of that authorized herein, onupland areas and in such a manner as to not re-enter any aquatic area.

16. Appropriate soil erosion and sediment controls must be used and maintained in effectiveoperating condition during construction, and all exposed soil and other fills, as well as any workbelow the ordinary high water mark, must be permanently stabilized at the earliest practicabledate. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow.

17. The permittee is responsible for all work accomplished in accordance with the terms and conditions of this authorization. If a contractor or other authorized representative will beaccomplishing the work hereby authorized in behalf of the permittee, such parties shall beprovided a copy of this authorization so they are aware of the terms and conditions. An activitywhich fails to comply with the terms and conditions of this authorization will be consideredunauthorized and all responsible parties will be subject to appropriate enforcement action.

18. The permittee is responsible for all work accomplished in accordance with the terms andconditions of this authorization. If a contractor or other authorized representative will beaccomplishing the work hereby authorized in behalf of the permittee, such parties shall beprovided a copy of this authorization so they are aware of the terms and conditions. An activitywhich fails to comply with the terms and conditions of this authorization will be consideredunauthorized and all responsible parties will be subject to appropriate enforcement action.

19. Navigation: (a) No activity may cause more than a minimal adverse effect on navigation. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. (c) To protect the interests of the United States under Section 10 of the Rivers and Harbors Actin the Nashville District's navigable waters, the permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of such removal or alteration.

20. If the permittee sells the property associated with this RGP, the permittee may transfer the permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the RGP verification must be attached to the letter, and the letter must contain the following statement and signature: “When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this RGP and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.”

21. This verification is valid for two years from the date of issuance. If you commence or are under contract to commence this activity before the date that this RGP is modified, reissued or revoked, you will have twelve (12) months from the date of the modification, reissuance or revocation of the RGP to complete the activity under the present terms and conditions unless discretionary authority has been exercised on a case-by-case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 330.4(e) and 33 CFR 330.5 (c) or (d).

____________________________________________________________________ (Transferee)

APPLICATION PROCEDURES:

1. To receive consideration under this Regional General Permit, the applicant will be required to submit a Notice of Intent to construct a particular project to:

U.S. Army Corps of Engineers Nashville District Regulatory Division 3701 Bell Road Nashville, TN 37214 Phone: (615)-369-7500

2. The Notice of Intent submitted by the applicant must clearly describe the proposed work in order for the Nashville District to clearly determine whether or not the proposed work complies with the terms, conditions, and limitations of this General Permit.

Applications must contain the following information:

a) A cover letter describing the proposed work and indicating how the anticipated work will be accomplished; b) A design plan showing the size and location of the proposed structures and fill material proposed to be placed within waters for the United States and their relationship to other proposed or existing structures; c) A clearly marked site location map which includes latitude/longitude information, a scale bar, and a northing arrow.

3. Projects that otherwise meet the terms of this Regional General Permit will not be authorized if they adversely impact any of the following resources:

a) Historic, cultural, or archeological sites or practices as provided in the National Historic Preservation Act of 1966; b) Sites included in the National Register of Natural Landmarks which are published periodically in the Federal Register; c) Sites included in the most current listing of the National Register of Historic Places or sites known to be eligible for such listing and all monthly supplements as published periodically in the Federal Register; d) Projects which would cut off or block tributaries, oxbows, side channels, chutes or other backwater areas unless such blockage is designed to isolate exotic invasive aquatic species populations for beneficial aquatic ecosystem management purposes; and e) Projects on federally designated Wild and Scenic Rivers (unless written approval is granted by the managing agency).

4. The cumulative impacts of this Regional General Permit may be subject to reevaluation at the discretion of the District Engineer at any time, but will be reevaluated at least every five (5) years.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas