You can copy from here when filling out the rest of the page.
Time Extension to Install and Maintain a Floating Dock within the Mississippi River, Jefferson Parish, Louisiana
NAME OF APPLICANT: Moran Towing Company c/o Barnes Engineering Company, Attn: DonBarnes, P.O. Box 55726, Metairie, LA 70055LOCATION OF WORK: Project site is located within and along the right descending bank of theMississippi River, approximately 99.7 miles above Head of Passes, in Marrero, Louisiana, JeffersonParish, as shown on the attached drawings.Latitude: 29.904773 Longitude: -90.111134 Hydrologic Unit Codes: 08090100 Lower Mississippi-NewOrleansCHARACTER OF WORK: Time extension to install pilings for an elevated walkway and floatingdock. The 4’ by 350’ walkway would extend from the Mississippi River Levee to the floating dock,where 3 mooring dolphins will anchor the 35’ by 150’ floating dock. In addition a 50’ by 60’ limestonepad will be install for parking. Approximately 6,100 cubic yards of fill will be deposited which willimpact 4.78 acres of jurisdictional wetlands. Compensatory mitigation for impacts to the .1 acres ofjurisdictional wetlands was provided during the initial evaluation.