The applicant requests to retain approximately 7,300 linear feet of existing concrete lined channel.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant requests to retain approximately 7,300 linear feet of existing concrete lined channel and proposes to repair by replacement 911 linear feet (0.31 acres) of channel with new concrete. These repairs are necessary due to storm damage caused by Hurricane Harvey. The applicant proposes no new temporary or permanent impacts to wetlands or waters of the United States, no mechanized land clearing of trees or shrubs, nor modifications outside of the existing concrete lined ditch. The applicant has stated that they will utilize public roads, the Plantation Creek Drainage Easement, and the concrete lined ditch for construction access. The applicant has stated no construction access or activities will occur on adjacent properties.