Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

CONSTRUCTION OF A RESIDENTIAL SUBDIVISION IN TERREBONNE PARISH

NAME OF APPLICANT: Dantin Bruce LLC., c/o Hydrik Wetlands Consultants, Attn: Mike Henry, 2323 Highway 190 East, Suite 2, Hammond, LA 70401.

LOCATION OF WORK: Located along the west side of LA Hwy 660, in Houma, Louisiana, in Terrebonne Parish, as shown on the enclosed drawings.Latitude: 29.653469° Longitude: -90.743850° Hydrologic Unit Code 08090302 (Terrebonne Basin Watershed)

CHARACTER OF WORK: The applicant has requested authorization to clear, grade, excavate and deposit fill and/or aggregate material to construct a residential housing development, Adley Oaks Subdivision. Work will include construction of 227 lots and residential home sites, roads, green spaces, utilities, drainage infrastructure and retention ponds. Approximately 152,800 cubic yards of material will be excavated and deposited on-site to achieve the necessary grade elevations. The applicant proposes to re-route a segment of an existing jurisdictional ditch, by filling 590 linear feet of the ditch and excavating 724 linear feet of re-routed ditch, as shown on the permit drawings. The project is expected to impact to approximately 2.3 acres of wetlands and approx. 0.1 acre of waters of the U.S. The applicant proposes to purchase compensatory mitigation credits from a USACE approved mitigation bank for unavoidable wetland impacts, should a DA permit be issued.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas